Laserfiche WebLink
23. Tamper-Resistant Receptacles in accordance with 406.41 of the 2016 N.E.0 <br /> .24. In accordance with the Land Development Code,lots.shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hotw6terpipe insulation <br /> insulation for hot water pipe with a minimum:thermal resistance (R.-value) of R-3 shall be applied to the <br /> foilowing: <br /> Piping �j, inch (19.1 mm)and larger in.nominal.diameter. <br /> Piping serving more than one dwelling unit. <br /> Piping located outside the conditioned space. <br /> Piping from the Water heater to a distribution manifold.. <br /> Piping.located under,a floor slab. <br /> Buried in-piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25.Blower door test shall be provided before C.O: <br /> 26. A copy of the enemy cacls shall be with permit at all times- <br /> 27. Copt/of fnal insulation report shall be provided with permit before final <br /> 28. No fence, pool or screen enclosure :is issued with:this-permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.=Americans with Disabilities Act. N.E.C.-National Electric Code(2016) ; <br />