NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit-may be subject to"deed"restrictions"
<br /> which may be more restrictive than County regulations. The undersigned.assumes responsibility,for compliance with any
<br /> applicable deed restrictions. ,
<br /> UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES.— If the owner has hired a contractor or
<br /> contractors to undertake work, they may be required to be licensed in-accordance with.:state and local regulations. If the
<br /> contractor is not licensed as required by law, both the owner and contractor:may be cited for a-misdemeanor violation
<br /> under state law. If the owner or intended contractor are uncertain as to what licensing requirements may-apply for the
<br /> intended work, they are advised to contact the Pasco County Building Inspection Division—Licensing Section at 727-847-
<br /> 8009. Furthermore, if the owner has hired a contractor or contractors,.he- is advised to, have the contractor(s) sign
<br /> portions of the "contractor Block" of this.application for which they will be responsible. If you, as the-owner sign as the
<br /> contractor, that may be an indication that he is not properly licensed and is not entitled.to-permitting•privileges'in Pasco
<br /> County.
<br /> TRANSPORTATION IMPACT/UTILITIES IMPACT.AND:RESOURCE RECOVERY FEES: The undersigned understands
<br /> that Transportation Impact Fees and Recourse Recovery Fees,may apply to the.construction of-new buildings, change of
<br /> use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordinance number 89-07 and
<br /> 90-07, as amended. The undersigned also understands,,that--such fees, as may be due, will be identified at the time of
<br /> permitting. It is further understood that Transportation.Impact.Fees:and Resource Recovery Fees must be paid prior to
<br /> receiving a "certificate of.occupancy" or final power release. If-the project does not involve a certificate of occupancy or
<br /> final power release, the fees must be paid prior to permit issuance. -Furthermore,'.if Pasco County Water/Sewer Impact
<br /> fees are due,they-must be paid prior to permit issuance in accordance with applicable.Pasco County ordinances.
<br /> CONSTRUCTIOWL-IEN LAW(Chapter 71.3;.Florida Statutes;as amended): If valuation of work is$2,5.00.00 or more, 1
<br /> certify that I, the applicant, have been•provided with a•copy of the "Florida•Construction•Lien Law—Homeowner's
<br /> Protection Guide" prepared by the Florida Department of Agriculture-and:Consumer.Affairs, If-the-applicant is someone
<br /> other than the"owner", I certify that.1 have obtained a copy of the-above'descriibed document and promise in good faith to
<br /> deliver it to the"owner".prior to commencement.
<br /> CONTRACTOR'SIOWNEWS;AFFIDAVIT: I,certify that,all the:information in this,application is accurate and that all.work
<br /> will be done in compliance with all applicable laws regulating construction;'zoning and land development. Application is
<br /> hereby made to -obtain a permit to d`o work and installation- 'as indicated: I certify that no work or. installation has
<br /> commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating
<br /> construction, County and"City, codes; zoning.regulations, -and,land development regulations in the jurisdiction. I also
<br /> certify, that I understand that the regulations of other:government agencies may apply to the,intended work, and that it is
<br /> my responsibility to identify what actions I musttake to be•in compliance. Such agencies include but are not limited to:
<br /> Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive
<br /> Lands,Water/Wastewater Treatment.
<br /> Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas., Altering
<br /> Watercourses.
<br /> Army Corps of Engineers-Seawalls, Docks, Navigable Waterways.
<br /> Department of .Health &:Reha'bilitative Services/Environmental Health Unit=Wells, Wastewater Treatment,
<br /> Septic Tanks
<br /> US Environmental.Protection-,.Agency",Asbestos.abatement.
<br /> Federal Aviation Authority-Punways.
<br /> I understand.that'the following restrictions.apply-to-the-use of,fill:
<br /> - Use of fill is not-alibwed in Flood'Zone W"uhless•expressly permitted.-
<br /> - If the fill material is to be used in Flood Zone "A", it is understood•that a drainage plan addressing a
<br /> "compensating volume"-will be submitted at time of.permitting-which Js prepared by a professional engineer
<br /> licensed by the State of Florida.
<br /> - If the fill material is to be used;in Flood Zone "A"' in connection with a permitted building using stem wall
<br /> construction, I certify that fill,will be used only to fill the area within the.stem wall.
<br /> - If fill.material is to be used in any area, I certify that use.of such.fill will not adversely affect. adjacent
<br /> properties. If use of fill is found to adversely affect adjacent:properties, the,owner may.be.cited for violating
<br /> the conditions of the building permit issued under-the attached permit application, for lots less than one (1)
<br /> acre which are elevated-by fill; an engineered drainage.plan•is required.
<br /> If I am the AGENT FOR THE OWNER, I promise in good'faith to inform-the owner of the permitting conditions set forth in
<br /> this affidavit prior to commencing construction. I understand.that a separate permit may be required for electrical work,
<br /> plumbing, signs, wells, pools, air conditioning, gas, or other installations not specifically included'in the-application. A
<br /> permit issued'shall be construed to be a license to proceed with the work and not as authority to violate, cancel;•.alter, or
<br /> set aside any provisions of the technical codes, nor shall•issuance of a permit prevent the Building Official from-thereafter
<br /> requiring a correction.of errors in plans, construction or violations of any codes. Every-permit issued shall become.invalid
<br /> unless the work authorized by such permit is commenced within six months of:permit issuance, or if work-authorized-by
<br /> the permit is suspended or abandoned for a period of six(6) months.after-the time the.work is commenced. An extension
<br /> may be requested, in writing, from the Building Official for a period not to exceed ninety (90) days and will.demonstrate
<br /> justifiable cause for the extension. If work ceases for.ninety(90)'consecutive days, the job is considered abandoned.
<br /> WARNING TO-OWNER: YOUR FAILURE TO-RECORD-A NOTICE.OF COMMENCEMENT-MAY RESULT*IN-YOUR
<br /> PAYING TWICE FOR.IMPROVEMENTS TO'YOUR-PROPERTY.'. ]P YW-INT- NIb 1`O'OBTK1N FINANCING, CONSULT
<br /> WITH-YOURLEN.DER.OR AN ATTORNEY:BEF.ORE RECORDING-.YOUR.NOTICE.OF-COMMENCEMENT.
<br /> FLORIDA JURAT(F.S.117.03)
<br /> OWNER OR AGENT CONTRACTOR
<br /> Subscribed and sworn to(or affirmed)before me this Subscribed and sworn to(or affirmed)before me this
<br /> by by
<br /> Who is/are personally known to me or has/have produced Who is/are personally.known to me or has/have produced
<br /> as identification. as identification.
<br /> Notary Public Notary Public
<br /> Commission No. Commission No.
<br /> Name of Notary typed,printed or stamped Name of Notary typed,printed or stamped
<br />
|