My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-149
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-149
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2022 9:16:41 AM
Creation date
3/2/2022 9:16:40 AM
Metadata
Fields
Template:
Building Department
Company Name
DR HORTON INC
Building Department - Doc Type
Permit
Permit #
20-149
Building Department - Name
DR HORTON INC
Address
7780 DAVIE RAY DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D <br /> It 010 City of Zephyrhills <br /> PERMIT�NUM9E <br /> 5335 Eighth Street <br /> Zephyrhills, FL 33542 BNR-000149-202 <br /> ' t ` Phone: (813)780-0020 <br /> 4 "p Fax: (813)780-0021 Issue Date: 07/16/2020 <br /> Permit Type_ : Building New (Residential) <br /> Property, Number Street`Address <br /> 35 25 21 0140 01000 0130 7780 Davie Ray Drive <br /> Owner Information Permit Information Contractor'Information' <br /> Name: D R HORTON INC Permit Type:Building New(Residential) Contractor: D R HORTON <br /> Class of Work:SFR Construct <br /> Address: 12602 Telecom Dr Building Valuation:$104,000.00 <br /> TAMPA,FL 33637 Electrical Valuation:$6,800.00 <br /> Phone: (813)549-1968 Mechanical Valuation:$7,700.00 <br /> Plumbing Valuation:$5,000.00 <br /> Total Valuation:$123,500.00 <br /> Total Fees.$18,958.75 s <br /> Amount Paid:$18,958.75 <br /> Date Paid:7/17/2020 10:23:33AM <br /> Project Description <br /> CONSTRUCT SINGLE FAMILY 1668 SQ FT <br /> Application Fees <br /> Park Impact Fee-Single Family/Townhome $769.56 Sewer Connection Residential Fee $2,090.00 <br /> SIF 1 percent Fee $83.28 Irrigation 3/4 Meter(Calc) $473.78 <br /> Public Safety Impact Fee-Fire $273.00 Plumbing Permit Fee $147.00 <br /> Public Safety Impact Fee-Admin $26.35 Electrical Permit Fee $220.50 <br /> Building Permit Fee $1,074.60 School Impact Fee $8,328.00 <br /> Public Safety Impact Fee-Police $254.00 3/4 Water Meter Fee(Calc) $473.78 <br /> Mechanical Permit Fee $102.90 Transportation Impact Fee $3,595.68 <br /> Transportation Impact Fee-City $36.32 Water Connection Residential Fee $1,010.00 <br /> REINSPECTION FEES: (c)With respect to Reinspection fees will comply with Florida Statute 553.80(2)(c)the <br /> local government shall impose a fee of four times the amount of the fee imposed for the initial inspection or <br /> first reinspection,whichever is greater,for each subsequent reinspection. <br /> Notice: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that <br /> may be found in the public records of this county, and there may be additional permit required from other governmental <br /> entities such as water management, state agencies or federal agencies. <br /> "Warning to owner:Your failure to record a notice of commencement may result in your paying twice for <br /> improvements to your property. If you intend to obtain financing, consult with your lender or an attorney <br /> before recording your notice of commencement." <br /> Complete Plans,Specifications add fee Must Accompany Application.All work shall be performed in <br /> accordance with City Codes and Ordinances. NO OCCUPANCY BEFORE C.O. <br /> NO OCCUPANCY BEFORE C.O. <br /> CONTRACTOR SIGNATURE PE IT OFFICE <br /> PERMIT EXPIRES IN 6 MONTHS WITHOUT APPROVED INSPECTION <br /> CALL FOR INSPECTION - 8 HOUR NOTICE REQUIRED <br /> PROTECT CARD FROM WEATHER <br />
The URL can be used to link to this page
Your browser does not support the video tag.