Laserfiche WebLink
23. Tamper_ Resistant.Receptacles in accordance with 406.11 of the-2016 N.E:C <br /> 24. In accordance with the Land Development Code, lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25: R403.5.3Hot Water.pipe insulation <br /> Insulation for hot water'pipe with a minimum thermal resistance (R-value) of R-3 shall tie applied to the <br /> following: <br /> Piping'3/: inch (19.1 mm) and larger in.nominal diame_ter.. <br /> Piping serving more than one dwelling unit. <br /> Piping located outside'the conditioned space, <br /> Piping from the water heater to.a_distribution manifold:. <br /> Piping-located under a floor slab. <br /> Buried in piping.. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> -25. Blower.door test shall be provided before C.O: <br /> 26. A cope ofthe energy cacls shall be_with permit at all dines <br /> 27. Conv of final insulation report shall be provided with permit before fnaL <br /> 28. No fence,pool or screen enclosure:is issued with:this permit. <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6t'Edition <br /> R.O.W.--Right of Way <br /> A.D.A.=Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />