' � D <br /> Q <br /> � r\U ICl <br /> i' IS <br /> Single Family Dwelling <br /> Plan Review Comments <br /> 1. F.F.E..shall be a minimum of 8" above the road elevation and an engineered site plan. <br /> 2. Lots shall be graded to comply with R401.3 of the F.B.C. <br /> 3. Compaction test required if 24"or more of fill dirt is brought in at any one place. <br /> 4. Tie in survey required before pouring concrete. <br /> 5. Driveways require.a R.O.W. use permit: All 4 sides of driveway thru the sidewalk shall have <br /> expansion material. <br /> 6. All setbacks shall be,met. <br /> i. All,property markers shall be uncovered'arid marked at time of first inspection. <br /> 8: All A.D.A. requirements shall be met. <br /> 9. No electric,plumbing, mechanical, or framing shall be covered without an inspection and <br /> approval first. <br /> 10. All Garages shall comply with section R302.6 of the F.B:C. (Fire Separation). <br /> 1 1. Appliances shall not be installed_ in a location where subject to mechanical damage unless <br /> protected by approved barriers. M303.4 of the F.B.0 <br /> 12. Water heaters shall comply with section P607.3 of the F.B.C. <br /> 13, Foundation supports for A/C units shall.be raised at least 3"above finished grade. M1308A <br /> 14. Return air in all bedroarns. F.B.C. M1620.4 <br /> 15. Smoke detectors.are to be installed in accordance with R313.1 of the F.B.C. <br /> 16. All glazing requirements are to be in accordance with R308A of the F.B.C: <br /> 17. All means of egress are to be in accordance with R311 of the F.B.C. <br /> 18 "Green gypsum board" shall not be used as a backer in showers or tubs. R702.4.2 F.B.C. <br /> 19. Combination-type AFCl breakers are required at all locations requiring an AFCI type breaker. <br /> 20. Carbon monoxide alarms will be required in new construction that uses fossil-burning heating <br /> or appliances or an attached garage. They shall be installed in accordance with the F.B.C: <br /> 21. All plumbing,mechanical; and electrical shall be separate from unit to unit: This includes all <br /> underground plumbing and electric. <br /> 22. All 2016 N.E.C. Codes will be enforced. <br /> - .y t 11 aci or tnergy Forms;R-O-W Permit for new construction, . <br /> Sanitary Facffes&I umpster,site work Permit Minimum ten(10)working days after submittal date. Required onsite,construction Plans,Stormwater Plans w!Silt Fence installed, <br /> COMMERCIAL. Atfach(2)complete sets of Building Plans plus a LferSa ety Page,(1)et of Energy Farms.R-O_. I <br /> Minimum ten(10)working days after submittal date. Required onsite,construction Plans,Stormwater Pans w!Silt Fence installed, <br /> Permit for new construction. <br /> Sanitary Facilities&1 dumpster.Site Work Permit for all new projects.All commercial requi <br /> SIGN PERMIT Attach(2)sets of Engineered Plans. rements must meet compliance <br /> ****PROPERTY SURVEY required for all NEW construction. <br /> Directions; <br /> Fill out application completely. <br /> Owner&Contractor sign back of application,notarized <br /> if over$2500,a Notice of commencement is required. (A/C upgrades over$7500) <br /> Agent(for the contractor)or Power of Attomey(for the owner)would be someone with notarized letter from owner authorizin same __......._... .. ..- <br /> OVER <br /> Rs Hif shingles,O NTER PERMITTING (copy of contract required) <br /> uired g <br /> Sewers Service Upgrades A/C <br /> Fences{PIotlSurveylFoctage} <br /> Driveways-Not over counter if on public roadways..needs ROW '- <br />