Laserfiche WebLink
21 Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. It accordance with the Land Development Code, lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25: R403.5.3Hot water pipe insulation <br /> Insulation-for.hot water pipe with a minimum thermal resistance (R.-value) of R-3 shall be applied to the <br /> following: <br /> Piping V. inch (.1.9.1 mm) and larger in.nominal diameter. <br /> Piping serving more than one dwelling unit. <br /> Piping located outside the conditioned space. <br /> Piping from the.water heater to a distribution manifold. <br /> Piping located under a floor slab. <br /> Buried in piping. <br /> Supply and'return piping in recirculation systems other than demand recirculation systems. <br /> 25. Blower door test shall be provided before C.O: <br /> 26.A cove of the energy cacls shall be with permit at all times. <br /> 27. Copy of fibnal insulation report shall be provided with Permit before fnaL <br /> 28. 1Vo Lence,pool or screen enclosure :is issued with.this permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />