Laserfiche WebLink
23..Tamper- Resistant.Receptacles in accordance with 406.41 ofthe 2016 N.E.0 <br /> 24. In accordance with the Land Development Code,lots-shall be sodded before final at least.10 <br /> feet around the structure. <br /> 25: R403.5,3Hot.water pipe insulation . <br /> insulation for hot.water pipe with.a minimum thermal resistance.(R-value) of R-3 shall be applied to the <br /> following: <br /> Piping-1.inch-(1.9.1 mm) and larger in nominal diameter: . <br /> Piping serving more than,one dwelling unit: <br /> Piping located outside'the conditioned space. <br /> Piping from the water heater to.a distribution manifold:. <br /> .Piping.located under a floor slab: <br /> Buried in piping.' <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25.Blower door test shall be provided before C.O. <br /> 26.A copy of the enemy cacls shall be with permit at all limes <br /> 27 Cony of final insulation report shall be provided with permit before final . <br /> 28:No fence,pool or enclosure':is issued with:thispermit, <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6t'Edition . <br /> R.O.W.-Right of Way. <br /> A.D.A.=Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />