Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 N.E:C <br /> 24. In accordance with the Land Development Code,lots shall be sodded before final at least.l0 <br /> feet around the structure. <br /> 25. R403.5.3Hof water pipe insulation. <br /> Insulation for hot.water pipe-with a minimum thermal resistance (R-value) of R-3 shall.be applied to the <br /> following: <br /> Piping./; inch (19.1 mm)and larger in.nominal diameter._ <br /> Piping:serving more than one dwelling unit. <br /> Piping located outside the conditioned space:. <br /> Piping from the water heater to a distribution-manifold, <br /> Piping-located under a floor slab: <br /> Buried in piping, <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25.Blower door test shall be provided before C.O: <br /> 26.A copy of the enerey cacls shall be with permit at all times <br /> 27 Copu of final insulation:reiort shall be Provided with yermit before final <br /> 2.8. No fence, pool or screen enclosure is issued with this bermii± <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code Oh Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />