My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-167
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-167
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2022 9:28:04 AM
Creation date
3/2/2022 9:28:03 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
20-167
Building Department - Name
GALSTER,DAISY
Address
5939 17TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL <br /> ® P PROPANE GAS <br /> AND A/C INC. <br /> S�c��988 813-782-5013 <br /> 4441 Allen Road—Zephyrhills,FL 33541 <br /> Ph:813-782-5013 Fax:813-783-1374 <br /> Website: www.bahrs�ropanegasandac.com E-mail: sarah@,bahrsinc.com <br /> Proposal Submitted To: Bruce Galster Date: May 11, 2020 <br /> Name: Daisy M. Galster Irrevocable Special Phone: 813 788-2759 <br /> Care Trust Job Name: Galster <br /> Street: 5939 171h St City, State &Zip: Ze h rhills, FL 33542 <br /> We hereby submit specifications and estimates for: <br /> • Bahr's will install one 3 Ton Franklin heat pump air conditioner <br /> • 14 SEER unit with 5 kW auxiliary heat <br /> • New digital thermostat <br /> • New hurricane pad with anchors <br /> • Complete duct system with approximately 10 supply drops and one return <br /> • Air handler in upstairs closet <br /> • Price includes permit <br /> * Price does not include A/C to east Florida room <br /> o Ductless system approximately $3,000.00 <br /> * Price does not include covering of exposed ducts <br /> * Unit comes with a 1 year labor and 10 year parts warranty <br /> Total: ........................................................ $7,495.00 <br /> All material is guaranteed to be as specified. All work to be completed in a workman like manner according to <br /> standard practices.Any alteration or deviation from above specifications involving extra costs,will be executed only <br /> upon written orders, and will become an extra charge over and above the estimate. All agreements are contingent <br /> upon strikes, accidents, or delays beyond our control. This proposal is subject to acceptance within 90 days and is <br /> void thereafter at the option of the undersigned. <br /> Authorized Signature eui� <br /> Acceptance of Proposal <br /> The above prices,specifications,and conditions are hereby accepted.You are authorized to do the work as specified. <br /> Payments will be made as outlined above. <br /> ACCEPTED: Signature: Date: <br /> S S/KB <br />
The URL can be used to link to this page
Your browser does not support the video tag.