Laserfiche WebLink
7-8"See Pattern Detail l. TREATMENT I TREATMENT 11 <br /> Drop-Off(%'Min.,1"Max.) <br /> Edge Of Any Existing <br /> I�Drop-Off(K°Min.,1'Max.) Width Called For In The Plans(Shoulder Width Plus 7 Min.) <br /> Less Than 3'overlay I { I Or New Pavement �_ <br /> / /--Backfill(Excavated Turf and Topsoil) 1, r 7-8'See Pattern Detail <br /> J /�i l 3"Or More Overlay i f <br /> ___ —}—i--y Sod(Avg,Depth IiV) <br /> Turf Varies.7 Min. <br /> Sod(Avg.Depth I ) <br /> (Depending on ___asphalt overlay depth may require <br /> trenching or borrow under sod to attain the 11 __[—— 12=vated <br /> Salvaged Turf And Topsoil Excavated Turf And Topsoil <br /> drop at the edge of pavement.) —_ (Gap Fori rainage) <br /> `mg Turf And Topsoil To Be And Replaced With Borrow i <br /> COMPLETED SHOULDER <br /> CRITERIA FOR USING TREATMENT I J `— <br /> Project __ SHOULDER OPTION I <br /> is resurfacing,widening and resurfacing or construction <br /> of shoulder pavement <br /> • is rural or is urban without curb and gutter <br /> • resurfacing build-up is less than 3" <br /> Sod Blocks Shah Be <br /> Placed <br /> W)th Staggered <br /> Transverse Joints <br /> 1,-0' <br /> ` Drop-Off IV"Min.,I"Max.) <br /> r Width Called For In The Plans(Shoulder Width Plus 7 Min.) <br /> Edge Of Any Exlsting <br /> —� tI•-- <br /> Edge 0/Pavement Pavement Z-B"See Pattern Detail <br /> Or New <br /> PLAN VIEW 3'Or More Over'- it^— <br /> PATTERN DETAIL Sod(Avg.Depth 1Vi) <br /> Turf ._ Varies.7 Min. <br /> I- <br /> --�� Borrow <br /> GENERAL NOTES Mix To Depth Indicated \ <br /> I. Treatment 1: In Specifications Or Plans \\ <br /> If trenching under sod is necessary areas <br /> as at t the required Dropm,. excavated topsoil n Is <br /> to 6e used for filling voids and low areas at the edge of pavement or for flushing along the <br /> edge of sod. Excess material to be uniformly distributed over the shoulder. SHOULDER OPTION 2 \\ <br /> 2.Treatment If: <br /> CRITERIA FOR USING TREATMENT It <br /> A.Borrow must meet the requirements for a'SelecV material in accordance with Index 120-001 <br /> and Spec/llcatlon 120. Pro)ec[__ <br /> is resurfacing or construction of shoulder pavement <br /> B.Borrow may be used in lieu of excavated turf and topsoil when economically feasible. There !s rural or is urban without curb and gutter <br /> will be no additional payment for substituting borrow for excavated turf and topsoil. - resurfacing build-up is 3'or more <br /> 3.Special attention is to be directed at achieving the required Drop-Off at the edge of pavement, <br /> within the dimension range shown. <br /> 6.Activities such as clearing,grading,and excavating that will disturb one or more acres of land A SIMILAR TREATMENT MAY BE USED FOR PROJECTS THAT REQUIRE SHOULDER WIDENING. <br /> g g DETAILS ARE TO BE SHOWN IN THE PLANS. <br /> require coverage under the the F c Permit for StormwaterEnv Discharge from Large and Small <br /> Construction Activities/rpm the Florida Department of a erosion <br /> and Protection,and implementation <br /> m appropriate pollution prevention measures to minimize erosion and sedimentation and properly <br /> manage stormwater. <br /> 5.Turf Establishment: <br /> $ A.Wildflowers destroyed by shoulder sodding and turf operations are to be reestablished under <br /> the seeding rates prescribed for permanent wildflower 02 Group shown by table on Index 570-001. <br /> B.Establish turf In accordance with Specification 570. <br /> L45T JDESCRIPTION: <br /> REVISION u, FY 2019-20 SHOULDER SODDING AND INDEX SHEET <br /> 11101118 F STANDARD PLANS TURF ON EXISTING FACIILIITIIES 570-070 1 of 1 <br />