Laserfiche WebLink
7-O'See Pattern Detail-, TREATMENT 1 TREATMENT 11 <br /> j�_,,,' Drop-Off(h•Min.,1"Max.) <br /> t Drop-Off( Min.,I"Max.) Edge Of Any Existing <br /> Vi• <br /> less Than 3'Overlay 1 Width Called For In The Plans(Shoulder Width Plus 7 Min.) <br /> I Or New Pavement <br /> A/ /--Backfiil(Excavated Turf and Topsoil) 't �, (�7-6'See Pattern Detail r <br /> 3"Or More Overlay I �` <br /> Sod(Avg.Depth IW) <br /> Turf Varles.7 Alin. <br /> 1 I Sod(Avg.Depth I ) <br /> (Depending on asphalt overlay depth may require <br /> trenching or borrow under sod to attain the I' _ Salvaged Turf And Topsoil Excavated Turf And Topsoil <br /> —J drop at the edge of pavement.) ___ _— <br /> (Gap Fori ralnagel <br /> I Existing Turf And Topsoil To Be j <br /> COMPLETED SHOULDER I Excavated And Replaced With Borrow M <br /> CRITERIA FOR USING TREATMENT I <br /> Project___ SHOULDER OPTION 1 <br /> • Is resurfacing,widening and resurfacing or construction <br /> of shoulder pavement <br /> is rural or 1s urban without curb and gutter <br /> • resurfacing build-up is less than 3" <br /> Sod Blocks Shall <br /> Placed With Staggered <br /> 1'-4" Transverse Joints <br /> Drop-Off(I/;Min..I`Max.) <br /> io t Width Called For In The Plans(Shoulder Width Plus 7 611n.) <br /> Edge Of Any Existing t <br /> or New Pavement <br /> Edge Of Pavement r--Z-B'See Pattern Detail <br /> PLAN VIEW 3"Or More Overlay PATTERN DETAIL Sod(Avg.Depth 1Vr") <br /> �( Turf Varies,7 Min. <br /> Borrow <br /> GENERAL NOTES I Mix To Depth Indicated <br /> In Specifications Or Plans <br /> 1. Treatment I. <br /> If trenching under sod is necessary to achieve the required Drop-Off,excavated topsoil is <br /> to be used for filling voids and low areas at the edge of pavement or for flushing along the <br /> edge of sod. Excess material to be uniformly distributed over the shoulder. SHOULDER OPTION 2 <br /> 2.Treatment Il: <br /> A.Borrow must meet the requirements for a"Select"material in accordance with Index 120-001 CRITERIA FOR USING TREATMENT 11 <br /> and Specif(catlon 120. Protect <br /> • is resurfacing of construction of shoulder pavement <br /> S.Borrow may be used In lieu of excavated turf and topsoil when economically feasible. There • 1I rural or is urban without curb and gutter <br /> will be no additional payment for substituting borrow for excavated turf and topsoil. resurfacing build-up is 3"or more <br /> 3.Special attention is to be directed at achieving the required Drop-Off at the edge of pavement, <br /> within the dimension range shown. <br /> 4.Activities such as clearing,grading,and excavates that will disturb one or more acres of land A SIMILAR TREATMENT MAY BE USED FOR PROJECTS THAT REQUIRE 514OULDER WIDENING. <br /> require coverage under the Generic Permit for Stormwater Discharge from Large and Small DETAILS ARE TO BE SHOWN IN THE PLANS. <br /> Construction Activities from the Florida Department or Environmental Protection,and implementation <br /> of appropriate pollution prevention measures to minimize erosion and sedimentation and properly <br /> manage stormwater. <br /> 5.Turf Establishment: <br /> A.Wildflowers destroyed by shoulder sodding and turf operations are to be reestablished under <br /> the seedtag rates prescribed for permanent wildflower a2 Group shown by table on Index 570-001. <br /> B.Establish turf In accordance with Specification 570. <br /> LAST 2� DESCRIPTION: 1Y 2019-20 INDEX SHEET <br /> REVISION toFF�DS HOUI.DEIi SODDING AND <br /> 1110111s STANDARD PLANS TURF ON EXIISTIINC FAC7CI.IITIIES 570-010 ]of 1 <br />