Laserfiche WebLink
NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed"restrictions" <br /> which maybe more restrictive than County regulations. The undersigned assumes responsibility for compliance with any <br /> applicable,deed,restrictions. <br /> UNLICENSED CONTRACTORS`AND CONTRACTOR RESPONSIBILITIES: lf'the owner has hired 6 contractor or <br /> contractors to undertake work, they may be required to be licensed in accordance With state and local regulations. If the <br /> contractor is.not licensed as required by law, both theowner and,contractor may-be Cited for A misdemeanor violation <br /> under state law. .If the owner or-intended contractor pare uncertain as to what licensing requirements may apply for the , <br /> intended work, they are advised to contact the Pasco County Building Inspection Division—Licensing Section I at 727-847- <br /> 8009. Furthermore,.if the owner has hired-.a-contractor or contractors, he is advised to have the contractor(s) sign <br /> portions-of the "contractor Block" of this application-for which they Will be responsible. If you, as the owner sign as the <br /> contractor, that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco <br /> County. <br /> TRANSPORTATION IMPACTIUTILITIESJMPACT AND RESOURCE RECOVERY FEES.: The undersigned understands <br /> that Transportation-impact Fees--and Recourse Recovery Feies,may apply-61heconstriuction of-new buildings, change of <br /> use in existing buildings, or expansion of existing buildings, is specified in Pasco County Ordinance number 89-07-and <br /> 90-07, as,amended, The undersigned also understands,-that such fees, as maybe due, will be identified.at the time of <br /> permitting. It is further understood that Transportation Impact Fees and Resource Recovery fees must be paid prior to <br /> receiving a "certificate of occupancy" or final power-release. If the,-project does!hot involve a certificate of occupancy or <br /> final power release, the fees must be paid prior to permit issuance. 'Furthermore, if-Pasco County Water/Sewer Impact- <br /> fees are due,they must be.paid-prior-to permit issuance in accordanc&with applicable Pasco County ordinances. - <br /> CONSTRUCTION'LIEN LAW(Chapter 7131 Florida Statutes, as amended): lf:valuation-of work-'is$2,600.00 or-more, I <br /> certify that Il-the---applicant, have been.-provided With-a copy of-the '-'Florida -Construction-Lien Law—Homeowner's <br /> Protection Guide" prepared by the.Florida Department of Agriculture and Consumer Affairs: .If the applicant Is someone <br /> other than the"owner", certify that-I have obtained a copy of the above described 6ocumehfand promise in good faith to <br /> deliver it to the"owner,prior to commencement. <br /> CONTRACTOR'S/OWNER'S-AFFIDAVIT: I certify that all the information in this application is accurate and that all.work <br /> will be done in compliance with all applicable laws regulating construction, zoning and land.I development. Application is <br /> hereby made to obtain a permit to do work and-,inttallation as indicated. I certffy'that. no work.or installation has <br /> commenced prior to.issuance of a permit and that all work Will be performed to meet standards of all laws regulating, <br /> construction,-County-and City codes, zoning regulations, and land development, regulations in the jurisdiction. .1 also <br /> certify that I understand that the regulations of other government agencies may apply to the,intended work, and that it is <br /> my responsibility to identify what actions I must take to be in compliance. Such agencies include but:are not limited to: <br /> - Department of'Environmental Protection-Cypress Bayheads, Wetland.-Areas and Environmentally Sensitive <br /> La* nds,-WaterMastewater Treatment. <br /> - Southwest Florida Water Management. District-Wells, Cypress, Bayheads, Wetland Areas, Altering <br /> Watercourses. <br /> - Army Corps of Engineers-Seawalls, Docks, Navigable Waterways. <br /> - Department of Health & Rehabilitative Services/Environmental Health "Unit-Wells; Wastewater,Treatment, <br /> - <br /> Septic.Tanks. <br /> 'US-Environmental,,Protection,Agency-Asbestos-abatement. <br /> - <br /> Federal Aviation Authority Runways. <br /> I understand that the,--following restrictions,applyto the use of fill: <br /> Use of fill is-not allowed in Flood,Zone,W"unless expressly permitted.. <br /> If:the fll. material is.to be used in Flood Zone "A", it is und*6rstood that a drainage plan.addressing a <br /> a <br /> 'compensating volume" Will be submitted at time of permifting-Which.is prepared,by a professional engineer <br /> licens.6&bythe State of Florida. <br /> If'the:fill.mciterial.is-to-be-used'in-Flood,Z6ne "A" in connection with a permitted building using stem wall <br /> construction,w 11-certify,that fill will be-used-only to fill the area within-the-stern wall. <br /> If 1W material: is to be, used in any area,,I certify that use of such fill will not adversely affect adjacent <br /> properties:::if use of fill,is found to.adversely affect.adjacent properties-,,the:ownermay be,cited.for violating <br /> the conditions of the building permit issued under the attached permit application, for lots less than one (1). <br /> -.act.e,wh'ich.,are,.iblevated,by I <br /> fill- an engineered drainage plan is.,required. <br /> � ; <br /> If I am-the.-AGENT*�06ktliqk 'OWNER, I promise in good faith to inform.the owner:of the permitting conditions set forth in <br /> this affidav&wior..to-commencing construction. I understand that a separate permit may be required for electrical work, <br /> plumbing,-..Signsj.wbils' i,pools, -air,bonditioning,-gasi.or-other lnstallatidhs�not.specifically-included in the application. A <br /> permit issued.Shall,be,construed to be a license to proceed with.the work and not as authority to violate, cancel, alter,or <br /> set asidv1-ahyprovision't`6 f,th6techrildal codes; nog shall issuance of a permit prevent the Building Official from thereafter <br /> requiring-.a-correction-of errors in plans, construction or violations-of any codes-.- Every permit issued-shall-become invalid <br /> unless the work,authorized by such permit is commenced within six months of.permit issuance, or if work authorized by <br /> th6 permit-it-suspended or abandoned for a period of six(6)months after-the time the work is commenced. An extension <br /> may be requested,.in writing, from the Building.Official for a.period.not to exceed ninety (90) days and Will demonstrate <br /> justifiable cause for-the extension: -If work ceases: or ninety(90)==ns6cutive day. s,.the job.is considered-abandoned. <br /> WARNING TO-OWNER,- YOUR FAILURE TO RECORD A NOTICE-OF-.COMMENCEMENT MAY RESULT, IN YOUR <br /> PAYINGTWICEFOR".1IMPROVEM'ENTS TO-YOUR PROPERTY:-�IF:YOU'INTEND;TO..OBTAIN:FINANCING;CONSULT <br /> WITH YOUR LENDER OR AN ATiT��ORNEY".BEPOkF-,-,FtECORDING..YOUR NOTICE OF'o-MMENCEM.ENT., <br /> FLORIDA MAT(F S <br /> OWNER "A CONTRAC <br /> a <br /> Subscribe . n sworn (o Subscribed and swom o Me, <br /> y � U-'\-LJ) by OW-1 Ec-kinage- <br /> Who Islare' personally known to me or h 3d$lhieal�produced are personally known to me or hasYhave-produced <br /> e r C� I I -----As Identification. Identification. <br /> C.n Notary Public <br /> Notary Public <br /> Commission No. /4 A MmlssIo'rV4o'_\ <br /> d <br /> b <br /> jr:a: efore me s and swom o <br /> a ob oft-ft <br /> dt� eb scare -�F <br /> bl 1.ride <br /> Florida of - <br /> to <br /> of <br /> olary public State of F rida <br /> Name No <br /> ol <br /> ry <br /> Alicia He the-Cannon ill Alicia <br /> 'a�We <br /> Aiicia Herweb-cannon <br /> My Commission GG 218376 A 7 i <br /> M <br /> my mm ssion GG 218378 <br /> My Commission Expires 05/1612022 Expires 05/1612022 <br /> 044^ <br />