Laserfiche WebLink
21 Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. In accordance with the Land Development Code, lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25.. R4015.3Hot water pipe insulation <br /> Insulation for hot water-pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping-V, inch (19.1 mm) and larger in nominal diameter. <br /> Piping serving more than one dwelling unit. <br /> Piping located outside the conditioned space. <br /> Piping from the water heater to a distribution manifold:. <br /> Piping located under a floor slab. <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25. Blower door test shall be provided before C.O. <br /> 26 A COpy of the enerQy cacls-shall be with permit at all tunes <br /> 27 Copy of Thal.insulation-report-shall be provided ivith permit before rna' <br /> 28. No fence, pool or screen enclosure':is issued with:this permit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6 h Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />