My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-240
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-240
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2022 12:44:13 PM
Creation date
3/2/2022 11:02:09 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
20-240
Building Department - Name
EDINGTON,AARON
Address
4620 EAGLE RANCH DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. The following mounting types shall be used. Please refer to the mounting details for the associated mounting <br /> method requirements. Based on our evaluation, the uplift demand is less than the maximum allowable per <br /> mount and therefore is adequate. <br /> • Rock-It: (1) 5/16" lag screw. Pullout capacity based on National Design Specifications (NDS) of timber <br /> construction specifications for Southern Pine is 235 lbs/inch penetration. <br /> 4. Fasteners are installed to meet industry standards and this Aocument satisfies requirements in 2017 FBC <br /> 2303.4.5 verifying that the fasteners will not adversely affect the roof framing. <br /> 5. The maximum allowed spacing was calculated for the Wind Speed shown in paragraph B above, using the wind <br /> load uplift procedures of ASCE 7-10. These,spacing requirements apply to all mount types indicated above. <br /> The following values have been verified by in-house testing and the mounting hardware manufacturers' data, <br /> which are available upon request. Panel support connections should be staggered,where possible,to distribute <br /> load to adjacent members. <br /> Modules in Landscape Modules in Portrait <br /> Roof Zone Interior Ede Comer Interior Ede Corner <br /> Max Vertical Spacing in 40 40 40 66 66 66 <br /> Max Horizontal Spacing in 48 48 48 48 48 48 <br /> Max Uplift Load Ibs 560 448 415 332 266 246 <br /> D. Summary <br /> Based on the above evaluation,with appropriate panel anchors being utilized,the roof system designed on will <br /> adequately support the additional loading imposed_by the solar panels, if installed correctly. This evaluation has <br /> been performed for the structural elements only and verifies that they are in conformance with the 2017 Florida <br /> Building Code-Residential 6th Edition, current industry standards and practice, and the information supplied to us <br /> at the time of this report. <br /> If there are any questions regarding the above, or if more information is required, please contact me. <br /> \�\�%\\IIIIII////, <br /> Regards, \\\\���p� VA <br /> J. Matthew Walsh, PE S <br /> FL License No. 84923 7.0, <br /> N�8Y41�1 a <br /> STATE OF <br /> 0T� 1. tORVD <br /> s ONAI <br /> II <br /> 05/29/2020 <br /> Page 2 of 2 Vii onto <br />
The URL can be used to link to this page
Your browser does not support the video tag.