Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 406.11 of the 20161V.E.0 <br /> 24. In accordance with the Land Development Code, lots shall.be sodded before final at-least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot water pipe insulation <br /> Insulation for hot water pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> folbWing: . <br /> Pip:ing.31, inch (1.9.1 mm)and larger in nominal diameter.: <br /> Piping.serving more than one dwelling unit. <br /> Piping located.outside the conditioned space.- <br /> -Piping from the water heater to a distribution manifold:_ <br /> Piping,located under'a floor slab. <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than*demand recirculation systems. <br /> 25.-Blower door test shall be provided before C.O.- <br /> 26. A copy of the enerQy.cacts shaft be with permit at all thnes- <br /> 27. CopV offinat insulation re[iort shall be provided with Permit before rnab <br /> 28. No fence, pool or screen enclosure :is issued with thispermft. <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C-Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />