Laserfiche WebLink
23,Tamper-Resistant.Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. In accordance with the Land Development Code, lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25-._R403.5.3Hot water.pipe insulation. <br /> Insulation forhot_Water pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping.1.inch-(19:1 mm)and larger in.nominal diameter. <br /> Piping serving more than.one dwelling unit. <br /> Piping located outside the conditioned space. <br /> Piping Itorn the.water heater to a distribution manifold. <br /> Piping.lociated.un'dera floor slab. <br /> Buried in piping. <br /> Supply and:return piping in recirculation systems other than demand recirculation systems. <br /> 25: Blower door test shall be provided Before C.O. <br /> 26.A copy of the enemy:caclsshall be with permit at all times <br /> 27. Copt/of final-insulationreport shall be provided with permit before final <br /> 28. No fence, pool or screen enclosure :is issued with:this permit,-- <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C--Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way. <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />