Laserfiche WebLink
23. Tamper- Resistant.Receptacles in accordance with 406.11 of the 2016 N.E:C <br /> 24. 1h accordance with the Land Development Code, lots.shall be sodded before final of least 10 <br /> - <br /> feet around the structure: <br /> 25. R403.5.3Hot water pipe-insulation. <br /> Insulation for hot water-pipe-with a minimum-thermal-resistance (R-value) of R-3 shall.be applied to the <br /> follow- in <br /> Piping.j,inch (19.1 mm)and larger in nominal diameter. <br /> Piping serving more than one dwelling unit: <br /> Piping located outside the conditioned space. <br /> Piping from the water heater to a distribution manifold:. <br /> Piping located under_'a floor slab: <br /> Buried in piping, <br /> Supply and return piping in recirculation systems other than demand recirculation systems: <br /> 25. Blower.door test shall be provided:before C.O: <br /> .26. A copy of the energy cacls shall be=with permit at all times <br /> 27.. Copp of final insulation-report-shall be provided with permit before final <br /> 28:No fence, pool or screen enclosure :is issued with:thisPermit. <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6 h Edition <br /> R.O.W.-Right of Way <br /> A.D:A.=:Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />