NOTICE OF DEED RESTRICTIONS: The;undersigned understands that this permit may be subject to"deed!" restrictions"
<br /> which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance w?',h any
<br /> applicable deed restrictions.
<br /> UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor or
<br /> contractors to undertake work, they may be required to be licensed in accordance with state and local regulations. If the
<br /> contractor is not licensed'as required by law, both the owner and contractor may be cited for a.misdemeanor violation
<br /> under state law. If the owner or intended,contractor are uncertain as to what licensing requirements may apply for the
<br /> intended work, they are advised to contact,the Pasco County Building Inspection Division—Licensing Section at 727-847-
<br /> 8009. Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign
<br /> portions'of the "contractor Block" of this application for which they will be responsible. If you, as the owner sign as the
<br /> contractor, that may be an indication that he is not properly licensed and is not entitled to,permitting privileges in Pasco
<br /> County.
<br /> TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands
<br /> that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings, change of
<br /> use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordinance.number 89-07-and
<br /> 90-07, as amended. The;undersigned also understands, that such fees, as may be due, will be identified-at the time of
<br /> permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees. must be paid prior to
<br /> receiving a "certificate of occupancy" or final power release. If the project does not involve a certificate of occupancy or
<br /> final power release, the fees must be paid prior to permit issuance. Furthermore, if Pasco County Water/Sewer Impact
<br /> fees are due, they must be paid prior to permit.issuance in accordance with applicable Pasco County ordinances.
<br /> CONSTRUCTION,LIEN LAW.(Chapter 71�3, Florida Statutes, as amended): If valuation of work is $2,500.00 or more, I
<br /> certify that I, the.applicant, have been provided with a copy of the "Florida Construction Lien Law—Homeowner's
<br /> Protection Guide" prepared by the Florida I Department of Agriculture and Consumer Affairs. If the applicant is someone
<br /> other than the "owner", I certify that I have:obtained a copy of the above described document and promise in good faith to
<br /> deliver it to the"owner" prior to commencement,
<br /> CONTRACTOR'S/OWNER'S AFFIDAVIT: I certify that all the information in this application is.accurate and that all work
<br /> will be done in compliance with all applicable laws regulating construction, zoning and land development. Application is
<br /> hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has
<br /> commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating
<br /> construction, County and, City codes, zoning regulations, and land development regulations in the jurisdiction. I also
<br /> certify that I understand that the.regulations of other government agencies may apply to the intended work, and that it is
<br /> my responsibility to identify what.actions I must take to be in compliance. Such agencies include but are not limited to:
<br /> - Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive
<br /> Lands, Water/Wastewater Treatment.
<br /> Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas, Altering
<br /> Watercourses:
<br /> Army Corps of Engineers-Seawalls, Docks, Navigable Waterways. .
<br /> Department of Health & Rehabilitative Services/Environmental Health Unit-Wells, Wastewater Treatment,
<br /> Septic Tanks.'
<br /> US Environmental Protection Agency-Asbestos abatement.
<br /> - Federal Aviation Authority-Runways.
<br /> I understand that the following restrictions apply to the use of fill:-
<br /> .'Use of fill is not allowed in Flood Zone W"unless expressly permitted.
<br /> - If the.fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a
<br /> "compensating volume" will be submitted at time of permitting which is prepared by a professional engineer
<br /> licensed by the State of Florida.
<br /> If.the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall
<br /> construction, I certify that fill will be used only to fill the area within the stem wall.
<br /> If.fill material is to be used in .any area, .I certify that use of such fill will not adversely affect adjacent
<br /> properties. If'use.of fill is found to adversely affect adjacent properties, the owner may be cited for violating
<br /> the.conditions of the building permit issued under the attached permit application, for lots less than one (1)
<br /> acre which are elevated by fill,!an engineered drainage plan is required.
<br /> If I am the AGENT FOR THE OWNER, I promise in good faith to inform Jhe owner of the permitting conditions set forth in
<br /> this affidavit prior to commencing construction. I understand that a separate permit may be required for electrical work,.
<br /> plumbing, signs, wells, pools, air conditioning, gas, or other installations not specifically included in the application. A
<br /> permit issued shall be construed to be a license to proceed with the work and not as authority to.violatei cancel, alter,1 or
<br /> set aside any provisions.of the technical codes, nor shall issuance of a permit prevent the Building Official from thereafter
<br /> requiring a correction of errors in plans, construction or violations of any codes. Every permit issued shall become.invalid
<br /> unless the work authorized by such permit is commenced within six months of permit issuance, or if work authorized by
<br /> the permit is suspended or abandoned fora period of six(6) months after the time the work is commenced. An extension
<br /> may be requested, in writing, from the Building Official for a period not to exceed ninety (90) days and will demonstrate
<br /> justifiable cause for the extension. If Work'ceases'for ninety(90)consecutive days, th job is considered abandoned.
<br /> WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR
<br /> PAYING TWICE FOR.IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING,*CONSULT
<br /> WITH YOUR'LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT.
<br /> FLORIDA JURAT(F:S. 1,7.03)
<br /> 0VJNER9k,AGENT Q �/
<br /> .CON rRACTOR
<br /> u `scri--d and swo or itrrJ�d before e t is' sc ked and sworn o(o i irm ¢ before me t s
<br /> /- dUAn)by (� N Q L00d�' I .�•,`y'.",,•., ( ()a(� by Q �ICCQ
<br /> W o.is are personally k own to me or as/have produce �; �Oy_ o is/are personally kn to me or Has/have produced
<br /> — as identification. as identification. \�0
<br /> '•rnn`` z
<br /> z no
<br /> 30 0°»,
<br /> —Notaryci bite 3 Not P 4
<br /> Q3 m o •vrr-
<br /> �oyCr- c3
<br /> — v
<br /> Co mission No. 3 y cr- ommission
<br /> o'�• wy�•� a7
<br /> w,A M , o0 o y cn
<br /> Name of Notary typed,printed or stamped N m 6 m ame of Notary typed,printed or stamped BPS N'w o
<br /> :m OD
<br /> Cos o� P m wo N
<br /> wo
<br /> N N �
<br />
|