Laserfiche WebLink
NOTICE•OF DEED RESTRICTIONS: The undersigned,understands that this permit may be subject to"deed" restrictions" <br /> which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any <br /> applicable deed restrictions.. <br /> UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the•�owner has-hired a contractor or <br /> contractors to undertake work, they may be required to be licensed in accordance with state and local regulations. If the <br /> contractor is not licensed as required by law, both the owner and contractor may be cited for a misdemeanor violation <br /> under state law. If the owner or intended.contractor are uncertain as to what,licensing,-requirements may apply for the <br /> intended work, they are advised to contact the Pasco County Building Inspection Division—Licensing Section at 727-847- <br /> 8009. Furthermore, if.the owner has hired a contractor or contractors, he is advised to have the contractors) sign <br /> portions of the "contractor Block" of this application_for which they will be responsible. If you, as the owner sign as the <br /> contractor, that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco <br /> County. <br /> TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE.RECOVERY FEES: The undersigned understands <br /> that Transportation Impact Fees and Recourse Recovery-Fees may--applyto•the construction of new buildings, change of <br /> use in existing buildings; or expansion of existing buildings;as specified in Pasco County Ordinance number 89-07 and <br /> 90-07, as amended. The undersigned-also understands,-that such'fees,- as may-be due; will be.identified at the time of <br /> permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to <br /> receiving a "certificate of occupancy" or final power release. If the�project does noY"involve a certificate of occupancy or <br /> final power.release, the fees must be paid prior to permit issuance. furthermore, if Pasco County Water/Sewer Impact <br /> fees are..due,:-they:mast,be.paid.priorto permit issuance in.accordance With applicable Pasco County.ordinances. <br /> CONSTRUCTIOWUENNLAW(Chapter 713,--Florida Statutes, as amended): If valuation of work is$2,51)0:00 or-more, I <br /> certify. that I;-��the--,applicant, have been provided with-a copy of-the "Florida Construction Lien Law—Homeowner's <br /> Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. If the:applicant.is someone <br /> other than the"owneer";"lc6dify that I have obtained a copy of the above-described document and promise in good faith to <br /> deliver it to the"ownee,',prior to commencement.. <br /> CONTRACTOR'_S_IOWNER'S;AFFIDAVIT: I certify that all.the:information in,this;appl cation:is accurate:and.>that.all work <br /> will be done in compliance With all applicable laws regulating construction, zoning and1and development.' Application-is <br /> hereby made to obtain'a permit to do work and installation' a's` indicated: 1 'certify that no work.or installation has <br /> commenced ,prior:to:,issuance of a permit and that.all work will,be performed to..meet":.standards of all laws regulating <br /> construction;'County:.and City codes; zoning regulations, and.land=development-regulations in the jurisdiction. I also <br /> certify that.Jr understand-that the regulations of other government agencies may ap. -to-.-the.intended work, and that it is <br /> my responsibility to:identify what actions I must take to be in compliance. Such agencies include but are not limited to: <br /> Department of*Environmental Protection-Cypress Bayheads; Wetland .Areas,and.Environmentally Sensitive <br /> Lands;Water/Wastewater Treatment. <br /> Southwest Florida Water Management Disfrict Wells, Cypress: Bayheads, Wetland Areas, AlfeYing <br /> Watercourses. <br /> Army Corps of Engineers-Seawalls, Docks, Navigable Waterways: <br /> Department of Health & Rehabilitative Services/.Environmental :Health Unit-Wells, Wastewater Treatment, <br /> Septic Tanks. <br /> US>Environmental Protection.Agency-Asbestos°abatement:- <br /> Federal Aviation Authority-Runways. <br /> l.understand.that the:<following restrictions apply to the use <br /> Use of.fill`is not allowed in Flood,Zone'V,unlessadxlJtessly,permitted., <br /> If.the fill material 'is.to be used in Flood Zone "A';-it'is-`undersfood that a drainage plan addressing a <br /> "compensating volume'will be submitted at time of permitting4,which 2is.prepared by a professional engineer, <br /> licensed 2 by the State of Florida. <br /> If..the-fill material is to.be used'in _Flood.Zone "A";~n"'eonnection with a permitted building using stem wall <br /> construction,;.l certifythat fill will be•used only to fill"thi""6a�w thin the;stem:wall. <br /> If fill. maternaVis to be used in any area,.] certify t;at`,use of such-fill will not adversely affect adjacent <br /> properties,,.,:If use of fill is found.to adversely affect:`adjacent°:properties; the owner-may,be cited for violating <br /> the conditions of-the building permit issued under,the,attached:permit application, for lots less than one (1). <br /> acre-whichare.-:elevated':byfill, an.engineered�drainagd pl`.an is vrequired. <br /> If I am.the AGENT:F.dk:wk OWNER, I promise-in good"faitl ;to iriformAh:e7owner1of.-the.permitting,conditions set forth in <br /> this affidavit:.prior,to-commencing construction. I understand.that,a separate:permit may be required for electrical work,, <br /> plumbing,.,signs, wells;=.pools, air conditioning, gas; or-other installations:not��specifically included in the,application. A <br /> permit issued shall:be construed to be a license to proceed-with ahe,work and not as authority to violate, cancel; alter,;or <br /> set aside:any..provi§ions of the.technical codes, nor shall''issua6ce:;ofv-a,permit prevent the Building Official from thereafter;.;t; <br /> requiring':a correction of errors in plans, construction or violations'of-any-codes•: Every permit-issued shall become invalid <br /> unless the,work•authorized by.such permit is commenced within six;months-of permit issuance, or if work authorize&-by. <br /> the.permit"is-suspended or abandoned for a period of sik.:.(6)months-after theAime`the work'is'commenced. An extension <br /> may be:requested,,in writing,-from the Building Official for a,period not to exceed ninety (90) days and will demonstrate �.r�a <br /> justifiable cause forthe extension. If work.ceasesfor ninety(90)consecutive days,the job.is considered abandoned. <br /> --WARNING TO OWNER: YOUR,FAILURE`-TO-RECORD A-NOTICE-OF-COMMENCEMENT MAY-RESULT IN YOUR'", <br /> PAYING`1 ICE'FORIIMPROVEMENTS°TO.YOUR-PROPERTY:~"1F`YOU'IN.TEND'TO` N FINANCING;CONSULT " ' " <br /> WITH YGUR'.LEND.ER OR AN ATTORNEYBEFORE-REGORDING.'YO'U CE OF-COMME . MENT. <br /> FLORIDA"JURAT'(F�ti' 3) <br /> OWNER OR AGENT IN -A CONTRACTOR <br /> Sub cribed and sworq 1cor affirmed) *fore me this Subscribed and swops to(or affirm ore me this <br /> rq 1 IZO20 by L S IC l ?Q-M by ' 0,61 SckjD e,� <br /> o Is/areerst3t__"__n9wn•to me or hasJhave produced Who is/a eq?ElgTi� ZNI,2wn to me or has/have produced <br /> as identification. as Identification. <br /> 3 <br /> Notary Public "C Y1 •o� V�L, Notary. <br /> Public <br /> Commission No. <br /> Commission No. <br /> p"'.. KATHAIN M ROBINSON <br /> Florida <br /> Name of Nota "ted ofo�t�GG 321868 Name.of Nota' :' Intl$ I ate of Florida <br /> My Comm.Expires Jun Z,2023 <br /> Bonded through National Notary Assn. <br /> vn.°.• My Commission GG 321868 <br /> g - '•' Comm.Expires Jun 2,2023 <br /> Bonded through National Notary Assn. <br />