Laserfiche WebLink
23. Tamper-Resistant Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. In accordance with the Land Develop_merit Code, lots shall be sodded before final_ at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot water pipe insulation <br /> Insulation for liot_watec pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping 3/;inch (19.1 mm)and larger in nominal diameter. <br /> Piping serving more than one dwelling unit. <br /> Piping located outside the conditioned space.. <br /> Piping from the water heater to a distribution manifold. <br /> Piping located under a floor slab. <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25: Blower door test shall be provided before C.O. <br /> 26.A copy of the energy cacls-shall be with'yernut at all times <br /> 27. Copy of Thal'insulation report shall hb provided with Permit before fnaL <br /> 28. No fence, pool onscreen enclosure :is issued with:thispermit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6 h Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />