Laserfiche WebLink
e <br /> \\ TRN1Ty ERC <br /> I . <br /> 5.7 For mechanically attached insulation or membrane or strip-bonded insulation,the maximum design pressure <br /> for the selected assembly shall meet or exceed the Zone 1 design pressure determined in accordance with FBC <br /> Chapter 16. Zones 2 and 3 shall employ an attachment density designed by a qualified design professional to <br /> resist the elevated pressure criteria. Commonly used methods are ANSI/SPRI WDl, FM Loss Prevention Data <br /> Sheet 1.29, Roofing Application Standard RAS 117 and Roofing Application Standard RAS 137. Assemblies <br /> marked with an asterisk*carry the limitations set forth in Section 2.2.10.1 of FM Loss Prevention Data Sheet <br /> 1-29(January 2016)for Zone 2/3 enhancements. <br /> 5.8 For.assemblies with all components fully bonded in place, the maximum design pressure for the selected <br /> assembly shall meet or exceed critical design pressure determined in accordance with FBC Chapter 16. No <br /> rational analysis is permitted.for these systems. <br /> 5.9 For mechanically attached insulation or membrane over existing roof decks, fasteners shall be tested in the <br /> existing deck for withdrawal resistance. A qualified design professional shall review the data for comparison <br /> to the minimum requirements for the system. Testing and analysis shall be in accordance with ANSI/SPRI FX- <br /> 1 or Testing Application Standard TAS 105. <br /> 5.10 .For bonded insulation or membrane over existing substrates in a re-roof(tear off) or recover installation,the <br /> existing deck or existing roof surface shall be examined for compatibility with;the adhesive to be installed. If <br /> any surface conditions exist that bring system performance into question, field uplift testing in accordance <br /> with ANSI/SPRI IA-1,ASTM E907, FM Loss Prevention Data Sheet 1-52 or Testing Application Standard TAS <br /> 124 shall be conducted on mock-ups of the proposed new roof assembly. <br /> 5.11 For bonded insulation or membrane.over existing substrates in a recover installation,the existing roof system <br /> shall be capable of resisting project design pressures on its own merit to the satisfaction of the Authority <br /> Having Jurisdiction, as documented through field uplift testing in accordance with ASTM E907, FM Loss <br /> Prevention Data Sheet 1-52 or Testing Application Standard TAS 124. <br /> 5.12 Metal edge attachment(except gutters),shall be designed and installed for wind loads in accordance with FBC <br /> Chapter 16 and tested for resistance in accordance with ANSI/SPRI ES-1 or Roofing Application Standard RAS <br /> 111,except the basic wind speed shall be determined from FBC Figure 1609.3(1),1609.3(2)or 1609.3(3). <br /> 5.13 All products in the roof assembly shall have quality assurance audit in accordance with F.A.C.Rule 611320-3. <br /> 6. INSTALLATION: <br /> 6.1 Mule-Hide TPO-c Single Ply Roof Systems shall be installed in accordance with Mule-Hide Products Co., Inc. <br /> published installation instructions,subject to the Limitations/Conditions of Use noted herein. <br /> 6.2 System attachment requirements for wind load resistance are set forth in Appendix 1. "MDP" = Maximum <br /> Design Pressure is the result of testing for wind load resistance based on allowable wind loads, and reflects <br /> the ultimate passing pressure divided by 2 (the 2 to 1 margin of safety per FBC 1504.9 has already been <br /> applied). Refer to FBC 1609 for determination of design wind pressures. <br /> 6.3 For mechanically fastened membrane systems (Type D) over profiled steel deck, membrane shall be installed <br /> running perpendicular to steel deck flutes. <br /> 7. BUILDING PERMIT REQUIREMENTS: <br /> As required by the Building Official or Authority Having Jurisdiction in order to properly evaluate the installation of <br /> this product. <br /> S. MANUFACTURING PLANTS: <br /> Contact the noted QA agency for information on product locations covered to F.A.C.Rule 61G20-3 QA requirements. <br /> 9. QUALITY ASSURANCE ENTITY: <br /> UL,LLC—QUA9625;(414)248-6409;karen.buchmann@ul.com <br /> -THE 27-PAGES THAT FOLLOW FORM PART OF THIS EVALUATION REPORT- <br /> Exterior Research and Design,I.I.C. Evaluation Report M35060.06.09-RS <br /> Certificate ofAothorization#9503 6T"EDITION(2017)FBC NON-HVHZ EVALUATION FL12772-RS <br /> Mule-Hide TPO-c Single Ply Roof Systems;(608)365-3111 Revision 5:09/11/2017 <br /> Page 4 of 4 <br />