Laserfiche WebLink
21 Tamper- Resistant Receptacles in accordance with 406.11 ofthe 2016 N.E.0 <br /> 24. In accordance with the Land Development Code, lots.shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25-. R403.5.3Hot water'pipe insulation <br /> Insulation for.hot water pipe with a minimum thermal resistance(R-value) of R-3 shall be applied to the <br /> following: <br /> Piping 31,inch (19.1 mm)and larger in nominal,diameter: <br /> Piping serving more than one dwelling unit. <br /> Piping located,outside the conditioned space. <br /> Piping from the water heater to a distribution manifold. <br /> Piping.located under,a floor slab. <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25. Blower door test shAU be provided.before C.O: <br /> 26.A copy of the energy cacls shall be-with peen:it at all times- <br /> 27.. Cony of final insulation report shall be provided with Hermit before final <br /> 28.No fence.-uool or screen-enclosure:is issued with ihis.permit <br /> F.F.E.-Finished_ Floor Elevation <br /> F.B.C- Florida Building Code 6a'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.=Americans with Disabilities Act N.E.C.-National Electric Code(2016) <br />