Laserfiche WebLink
23. Tamper- Resistant.Receptacles in accordance with 406.11 Of the 2016 N.E. <br /> 24. In accordance with the'Larid Development Code,lots shall be sodded before final at.leas_t 10 <br /> feet around the structure: <br /> 25: R403.5.3Hot.water pipe insulation <br /> Insulation for hot.water-pipe with'a minimum thermal resistance (R-value) of R-3 shall.be applied to the <br /> follow- in <br /> Piping:/; inch (19.1 mm)and larger in,-nominal diameter.. <br /> Piping,serving more than:one dwelling unit. <br /> Piping located outside the conditioned space:. <br /> Piping from the water heater to a distribution manifold:, <br /> Piping located under a floor slab: <br /> Buried in piping,. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25. Blower door test shall be provided before C.O: <br /> 26.A copy of the enerQy cacls shall be with permit at all times <br /> 27. Copy of fibial.insulation report shall be provided with permit before�naL <br /> 28:No fence,wool or screen enclosure :is issued witli.this per�nii: <br /> F.F.E.-Finished Floor Elevation <br /> RB.0 Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act. N.E.C.-National Electric.Code(2016). <br />