Laserfiche WebLink
t <br /> a. <br /> R <br /> 23. Tamper-Resistant Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. In accordance with the Land Development Code, lots_ shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25: R403.5.3Hot water pipe insulation <br /> Insulation for hot water pipe with'a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping V. inch (19.1 mm) and larger in.nominal diameter. <br /> Piping.serving more than.one dwelling unit. <br /> Piping located outside the conditioned space. <br /> Piping from the mates heater to a distribution manifold. <br /> Piping:located under a floor slab, <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25. Blower door test shall be provided before C.O: <br /> 26. A copy of the enerzy cacls shall be with yermit at all times. <br /> 27 Copy of final insulation-report shall be provided with permit before rinal <br /> 28.No fence, pool or screen enclosure :is issued with:thisPermit <br /> F.F.E.-Finished Floor Elevation - <br /> F.B.C- Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />