My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-425
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-425
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2022 6:47:21 AM
Creation date
3/4/2022 6:47:20 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
20-425
Building Department - Name
UDDIN,SHAHEEN
Address
37834 DAUGHTERY RD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CCS <br /> cj17VTCWn7N"-9%P <br /> License#CGC1505176 <br /> 25221 Wesley Chapel Blvd. <br /> Lutz,FL 33559 <br /> Phone(813)907-1013*Fax(813)907-0297 <br /> PROPOSAL <br /> Proposal Submitted to: Phone: Date: <br /> Bingham Realty Inc. 813-714-2317 July 13,2020 <br /> Street: Job Name <br /> 38070 Daughtery Rd House Demo <br /> City, State,Zip Job Location <br /> Zephyrhills,FL 33540 37834 Daughtery Rd. Zephyrhills,FL <br /> Attention Consultant: Email: <br /> Mr. Brian Infantino I binfantinobri@aol.com <br /> WE HEREBY SUBMIT SPECIFICATIONS AND ESTIMATES FOR: <br /> We propose to furnish all skilled labor, materials, equipment, license, and insurance necessary for the following scope of <br /> work: <br /> SCOPE: <br /> -*.- - Demolition of existing building <br /> -.1- CCS will provide demolition permit <br /> ❖ CCS to provide public utility locates <br /> ❖ All resulting demolition debris will be properly disposed of in a certified landfill or recycling facility <br /> 4- Site will be rough graded to resulting elevation <br /> EXCLUSIONS: <br /> ❖ Hazardous waste removal not listed above <br /> -*e Buried Tanks or debris <br /> ❖ Imported fill or erosion control <br /> ❖ Tree Removal or protection <br /> ❖ Well Abandonment <br /> Demolition Total -$2,400.00 <br /> We propose hereby to furnish material and labor complete in accordance with above specifications,for the sum of <br /> Payment to be made as follows: <br /> Upon Completion and Acceptance. <br /> All material is guaranteed to be as specified. All work to be completed in a <br /> workmanlike manner according to standard practices. Any alteration or deviation <br /> from above specifications involving extra costs will be executed only upon orders, <br /> and will become an extra charge over and above the estimate. All agreements 7 11-312-oaz> <br /> contingent upon strikes,accidents or delays beyond our control. Owner to carry Authorized Sig tur Gilmore—Senior Project Manager <br /> fire,tomado and other necessary insurance. Our workers are fully covered by Note:This proposal be withdrawn by us if not accepted <br /> Worker's Compensation Insurance. Within 30 dNays. <br /> Acceptance of Proposal: <br /> The above prices,specifications and conditions are satisfactory and are hereby Accepted by Ud-;,-, 71WIzo <br /> accepted. You are authorized to do the work as specified. Payment will be made <br /> as outlined above. <br /> Date of Acceptance: <br /> Please return one signed original to Cross Construction Services,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.