NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed"restrictions"
<br /> which may: more restrictive than County regulations. The undersigned,assumes responsibility for compliance with any
<br /> applicable-.deed,r,e.strictions.
<br /> UNLICENSED"CONTRAtTORS'*'AND'ICONTRACTOR'RESPONSIBILITIES: If*the owner has hired ei ,contractor or
<br /> contractors to undertake work, they maybe.-required,to�be licensed,in accordance with state and local,regulat
<br /> ions. If,the
<br /> ,contractor is not licensed as,required by law,both the'owner and-contractor maybe dited'for a.'.misdemeanor violation
<br /> under,state.law. ]f the owner or.ihtende&contractor�are uncertain as to what licensing requirements may apply for the
<br /> intended
<br /> d.wotk,they are advised-to;contact the Pasco County Building'ihspection*:Division"Licensihg Section at 727-847-
<br /> 8009. Furthermore,if the owner,'has-hired-a-contractor or..contractors, he is advised to have the contractor(s) sign
<br /> portions of.the."contractor Block' of-this:application for which they will be responsible., If you, as the owner sign as the
<br /> contractor, that may be-an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco
<br /> County.
<br /> TRANSPORTATION IMPACTIUTILITIES IMPACT AND RESOURCE RECOVERY FEES: *The undersigned understands
<br /> that Transport.ation--impact Fees-and%Recourse-Recovery Feesmay�apply�to the-construction of.new buildings, change of
<br /> use in existing*buildings, or expansion of existing buildings, as specified in Pasco County'Ordinance.number 89-07-and
<br /> 90-07, as-amended, The undersigned,also,under-stands,,that such`466s�, as maybe.due,,will.-be identified.at the time of
<br /> permitting. It is further underitood'thaf Trantpcirtt I ition Impact fees and Resource Recovery Fees must be paid prior to
<br /> receiving a "certifidate-of occupancy" or final power.-release. If-thepeoJect does;riotr1rivdive a certificate of occupancy or
<br /> final power release, the fees must be.paid prior to permit issuance'. 'Furthermore, if-Pascio County.;Water/Sewer Impact
<br /> fees are,due,-they.must.be-rpald.,priori1o,permit issuance in,accordance�wlth applicable Pasco County,ordinances.
<br /> CONSTRUCTION'LIEN LAW(Chapter 7139''Florida.Statute$, as amended): 'Ifvaluation.,of Work-it$2,500.00,or7 more, I
<br /> certify theit li the--applicant,--have-been-been- provided--with-a copy of-the "'Florida-Construction-:Lien Law—Homeowner's
<br /> Protection Guide" prepared by the Florida-Department of Agriculture and Consumer Affairs. If the applicant:is someone
<br /> other than the"6Wn6r"J c6dify-that]-have obtained a copy of the.,above described document and promiset in good faith to
<br /> deliver it to the"owner"prior to commencement.
<br /> CONTRAC.�T,OR?;SIOWNER'S,AFFIDANIT: L.certify that,all.the information,in this,appl,ipatipn,ls,a curateiandthat.all,w6rk
<br /> will be done in compliance with all applicable laws regulating construction, zoning-and--land',developtnent. Application.is
<br /> hereby made to obtain a permit to do work and installation as indlcat6d. -Lcertify that no work.or installation has
<br /> commenced prior to-issuance of a permit and that all work will- be performed to meet standards of all laws regulating
<br /> construction; County-and-City-codes,- zoning regulations, and land:development regulatl6ns in the jurisdiction. 1-also.
<br /> certify that 1,understand that the regulations of other government agencies may apply-tp,the!,intended work, and that it is
<br /> my responsibility to identify what actions I must take to be in compliance. Such agencies include but--are not limited_to:
<br /> Department of'Environmental Protection-Cypress Bayheads, W.etland:Areas-and Environmentally Sensitive
<br /> .Lands,.,WaterMastewater Treatment.
<br /> Southwest' Florida Water Management. District-Wells, Cypress, Bayheads, Wetland Areas, Altering
<br /> watercourses.
<br /> Army Corps of Engineeri-Seawalls, Docks, Navigable Waterways.,
<br /> Department of Health; & Rehabilitative Services/Environmental :Health 'Unit-Wells; Wastewater�Tr6atment,
<br /> Septic.Tahks.
<br /> USI-En.vir..Onmental,Protection,,Agency=Asbestos,abatement..,
<br /> FOd6ral-Avl6tibn AuthoritVRunWays.
<br /> I understand that the following.restrictions apply to the use of fill:-
<br /> Ude-offill,is,notallowed,lhi-FlobdiZone."W unless�expressly permitted..
<br /> lf'Ahe-:fill-.Materlal'is to be used in Flood Zone,"A", it is understood,that a 'drainage plan addressing a
<br /> "compensating vo
<br /> , ,--,volume" will'be.'submitted at time'of permitting:-which-is-prepared by a-professional engineer
<br /> Jicens.ad:by,the State of Florida.
<br /> If*11i"e',filt,material,.Is-to..be,-used-:in. Flood.,Zone "A"'in,connection with a permitted building using stem'-wall
<br /> -construction, -certlfy�that fill will be-used-only to fill.the area within-the-stem-wall.
<br /> if fill: material: is to be., used in any area,.I certify that use of such-fill Will not adversely affect adjacent
<br /> properties.,.;,-*.1f-use,-.of,,,fill,Js found to-adversely affect-adjAcentproperties;-the.-,owner-May bey cited for violating
<br /> the-conditions of the building permit issued 'Under-the attached permit application, for lots less than one (1),
<br /> acre,whid.ftweelevated.b fill;-an iengineered drainage plan i&-required.
<br /> k y.- 1 9 -
<br /> If I am.the,AG., N r, HEOWNER, I promise*in goodfaith-to iriform.the owner:of-the�permifting conditionsset forth in
<br /> this affidavit-:prior:to--cOmm-encihg construction. I understand that a separate permit maybe required for electrical work,
<br /> plum bingif-'sign-si,w6l1ti.:pools, ,aircondltioning-,..gas,:orother installatidhs;-not-specifically"included,in:the.application. A
<br /> permit issued-shall belconstrued to be a license to proceed with,4he work and not as authority to violate, cancel, alter,or
<br /> set asid6i,,-'o"!n.y..provisions'6f,.the tedhhical*;codes-:not thdil issuance..of-a-permit prevent the Building Official from thereafter
<br /> requiring.a,,c.orr,ecti.on-6f,-.errors.-in plans, construction or violations-of any-codes.. Every permit-issued.,shall.become invalid
<br /> unless the;work:authorized by.such permit.is commenced Within six months of,permit issuance,.or if work authorized,by
<br /> th6 permit"Is,suspended'or abandoned for a:period of six 6)months after 4he time the' otk is commenced*. 'An'extension
<br /> may betrequested,Jn writing, from the Building,Official for aperiod,;not to exceed ninety(90) day.s and Will demonstrate
<br /> justifiable cause forthe extension If work ceases?for ninety(90):,consecutive days,the job,is.considered,abandoned.
<br /> WARNING•TO-OWNER.,- YOUR:`FAILURE,TO RECORD A NOTICE-OF,--.GOMMENCEMENT-MAY--RESULT IN YOUR-
<br /> �
<br /> PAY ING:.T�-WIC-.E:,FOR-'IMPRQV�t-MENTS'T(Y,,-YOUR-!PROPF-RTY.'''IPYOU"INTEND*TO,.,oB-TA"IN-,-`FINANdiNG,'`CONSULT
<br /> WITH YOQW�LENDER OWAN'A RNEY-.BEI:O$Z REC-'ORDING_YO : MENT.-
<br /> FLORIDA"JU PA' T-'(Jr'S--1'1
<br /> OWNERDWAGENT CONT
<br /> Subscdbed,andby by
<br /> swoO��r t d)`bi;foJ!eft1Ii Subscribed.and-sw6m1o,(br,a a 'Identification.
<br /> Who Is/are personally known to me or has/have produced Who Islare personally known to me�,of-hggthave produced
<br /> as identification. s
<br /> Notary Public _Notary Public
<br /> Commission No. Commission No.
<br /> Name of Notary typed,printed or stamped Name.of Notary typ9d,printed or stamped-
<br />
|