My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-432 (2)
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-432 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2022 6:51:55 AM
Creation date
3/4/2022 6:51:53 AM
Metadata
Fields
Template:
Building Department
Company Name
DUKE ENERGY
Building Department - Doc Type
Permit
Permit #
20-432
Building Department - Name
DUKE ENERGY
Address
5934 19TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SYMBOLS: <br /> ® Work Area ` <br /> ■ Channelizing Device(See Index 102-600) <br /> [p Work Zone Sign Buffer <br /> Space 25V C B A <br /> IT' Flagger see <br /> b Lane Identification+Direction of Traffic Table 1 p <br /> Rono <br /> PREPARED ONE�E WDRK <br /> TD610P pr�pp AHFJID <br /> a b <br /> b Work Area b <br /> Device Spacing(See Table 1) <br /> Tangent <br /> VYDOAftDK DNE WIE BE <br /> AHeAo a�D m rv➢ Taper Length <br /> D 50'To 100' *May Be omitted if ROAD WORK AHEAD sign is installed upstream within the project limits. <br /> r <br /> A - B C <br /> WITHOUT TEMPORARY RAISED RUMBLE STRIPS <br /> GENERAL NOTES: <br /> TABLE 1 <br /> 1.Special Conditions may be required in accordance with these notes 4.When a side road intersects the highway within the TTC zone,place <br /> and the following sheets: additional TTC devices in accordance with other applicable TCZ Indexes. DEVICE SPACING <br /> 5.The two Channelizing devices directly in front of the work area may be Maximums Spacing Maximum Spacing of Distance <br /> A.Railroad Crossings: P 9 P 9 <br /> omitted provided vehicles in the work area have high-intensity rotating, Between <br /> a.!f an active railroad crossing is located closer to the Work Area than Posted b Cones or Type I or Type I! Buffer <br /> the queue length plus 300 feet,extend the Buffer Space as shown on flashing,oscillating,or strobe lights operating. Speed Tubular Markers Barricades/Panels/Drums .Signs Space <br /> Sheet 3. 6.When Buffer Space cannot be attained due to geometric constraints,use <br /> b.if the queuing of vehicles across an active railroad crossing cannot be the greatest attainable length,not less than 200 ft,for posted speeds On a On a On a On a <br /> avoided,provide a uniformed traffic control officer or flagger at the greater than 25 mph Taper Tangent Taper Tan a t A e C D <br /> . <br /> highway-rail grade crossing to prevent vehicles from stopping within 25 20' S0 20' 50' 200 200' 200' 700' 755' <br /> devices are in place. 30 29 50' 20' 50' 200' 200' 209 109 200' <br /> the highway-rail grade crossing,even if automatic[rain warning 7.ROAD WORK AHEAD and the BE PREPARED TO STOP signs may be omitted if <br /> B.If the Work Area encroaches on the Centerline,use the Layout for all of the following conditions are me[: <br /> Temporary Lane Shift to Shoulder on Sheet 3 only if the Existing 35 20' 50, 20' 50' 200' 200 1 200' 100' 250' <br /> Paved shoulder width is sufficient to provide for an 11'lane A.Work operations are 60 minutes or less. 40 20' 50, 20' 50' 200' 200' 209 100' 305' <br /> between the Work Area and the Edge of Existing Paved Shoulder. B.Speed limit is 45 mph or less. <br /> 9 9 C.There are no sight obstructions to vehicles approaching the work area for 45 20' 50201 50' 350'' 359 350' 175' 360' <br /> Reduce the posted speed when appropriate. a distance equal to the Buffer Space shown in Table 1, - 50 20' 50' 20' 100' 500' 500' 500' 250' 425 <br /> 2.Temporary Raised Rumble Strips: O.Vehicles in the work area have high-intensity,rotating,flashing,oscillating, 55 20' 50' 20' 100' 2640' I500' 1000' S00 495' <br /> or strobe lights operating. <br /> A Use when both of the following conditions are met concurrently: E.Volume and complexity of the roadway has been considered. 60 20' 50' 20' 10, 2640' 1509 1000' 500' 570' <br /> a. Existing Posted Speed is 55 mph or greater; F.If a railroad crossing is present,vehicles will not queue across rail tracks. 65 29 50' 20' 100' 2640' I500 1000 500' 645' <br /> b.Work duration is greater than 60 minutes. G.AFADs are not in use. <br /> B.Use a consistent Strip color throughout the work zone. 70 217 50' 20' 100' 2640, 1500' 1000' S00' 730' <br /> C.Place each Rumble Strip Set transversely across the lane at locations B.See Index 102-600 for general TCZ requirements and additional information. <br /> shown. 9.Automated Flagger Assistance Devices(AFADs)may be used in accordance <br /> D.Use Option 1 or Option 2 as shown on Sheet 2.Use only one option <br /> throughout work zone. with Specifications Section 702,990 and the APL vendor drawings. <br /> 3.Additional one-way control may be provided by the following means: CONDITIONS _ <br /> A.Flag-car <br /> B.Of rying vehicle; WHERE ANY VEHICLE,EQUIPMENT, <br /> ficial ve hicle; <br /> _ C.Pilot vehicles; WORKERS OR THEIR ACTIVITIES <br /> D.Traffic signals. ENCROACH THE AREA BETWEEN <br /> When flaggers are the sole means of one-way control,the flaggers THE CENTERLINE AND A LINE 2'OUTSIDE THE EDGE OF TRAVEL WAY. <br /> must be in sight of each other or in direct communication at all times. <br /> LAST 2 DESCRIPTION: FY 2020-21 INDEX SHEET <br /> REVISION ° T TWO-LANE, TWO-WAY, <br /> n/o1/17 W .t FDOr STANDARD PLANS WORK WII�'Ej[IN 'I HE 'dRAVEL WAY 102-603 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.