Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 N.E:C <br /> 24. In accordance with the Land Development Code,lots.shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot.water pipe insulation. <br /> insulation for hot.water pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following:. <br /> Piping.31. inch (19.1 mm)and larger in nominal diameter.. <br /> Piping serving more than:one dwelling unit. <br /> Piping located outside the conditioned space: <br /> Piping from the water'heater to a'distribution manifold. <br /> Piping.located under a floor slab: <br /> Buried in piping.. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25:Blower door test shall be provided,before' C.O. <br /> 26. A copy of the eneag cacls shall be with permit at all times- <br /> 27.. Copy of final insulation-report shall be provided ivith permit before final <br /> 28 No fence,pool or screen enclosure :is issued with:thispermit <br /> F.F.E.-Finished Floor Elevation <br /> RB.C- Florida Building Code 6th Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />