Laserfiche WebLink
23:Tamper- Resistant.Receptacles in accordance with 406.4 1'of the 2016 N.E:C <br /> 24. In accordance with the Land Development Code,lots.-shall be sodded before final at least 10. <br /> feet around the structure: <br /> 25. R403.5.3Hot water pipe insulation <br /> Insulation for hot-water'pipe Withh-a minimum thermal resistance (R-value) of R-3 shall.be applied.to the <br /> following: . <br /> Piping.1:inch (19:1.mm) and larger in.nomina.l diameter: <br /> Piping,serving more than one dwelling unit: <br /> Piping located outside the conditioned space: <br /> Piping from the:water-heater to a distribution manifold:- <br /> Piping:located under-a floor slab: <br /> .Buried in piping. : <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25:Blower door test shall be provided-beforeCO: <br /> 26.A copy of the energy cacls shall be with permit at all times <br /> - Cope of final.insulation report shall be provided with permit before�naL <br /> 28.No.fence,pool or screen enclosure :is issued with:this permit <br /> F.F:E:-Finished Floor Elevation <br /> RB.Cm Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way. <br /> A.D:A.-.Americans with Disabilities Act N.E.C.-.National Electric Code(2016) <br />