My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
20-543
Zephyrhills
>
Building Department
>
Permits
>
2020
>
20-543
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 2:04:59 PM
Creation date
3/4/2022 8:34:51 AM
Metadata
Fields
Template:
Building Department
Company Name
PASCO COUNTY FM DEPT
Building Department - Doc Type
Permit
Permit #
20-543
Building Department - Name
PASCO COUNTY FM DEPT
Address
MIS SEE DESCRIPTION SIMONS RD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Right of Way Use Permit <br /> CITY OF ZEPHYRHILLS - BUILDING DEPARTMENT <br /> RIGHT-OF-WAY USE PERMIT <br /> DATE: PERMIT# <br /> No construction underground or above ground of any facility shall be accomplished on any City Rights of <br /> Way without written approval from the City Building Department. Any application for approval of construction <br /> operations on any City owned Rights of Way shall furnish a detailed drawing showing the complete scope of <br /> the proposed work in triplicate to the office of the Building Official for approval prior to the commencement of <br /> any work. A copy of this permit is to be kept readily available at the site of the work at all times. <br /> PARCEL I.D. # CITY ROAD Simons Rd <br /> DATE April 19,2021 <br /> LOCATION (Legal Description): <br /> At Simons Rd and Eiland Blvd, along Eastside of Simons Rd going North for 3406'. <br /> Frontier is going to construct (2)1.25" HDPE by directional bore method along Eastside of <br /> Simons Rd from Sta. 101+18 to Sta. 135+24 @ 22' to 27' with the depth of 36" minimum. <br /> �. rGOm <br /> �r <br /> Permission is hereby granted to of <br /> for the construction and maintenance of: <br /> subject to the following conditions: <br /> 1. The construction and maintenance of such utility shall not interfere with the property and rights of a <br /> prior occupant. <br /> 2. All work shall be done in keeping with the standards of the City Streets Department and under the <br /> supervision of the City Building Official, who will be notified at least one day prior to commencement <br /> of construction. <br /> 3. All materials and equipment shall be subject to inspection by the City Building Official. <br />
The URL can be used to link to this page
Your browser does not support the video tag.