Laserfiche WebLink
23.;Tamper-Resistant.Receptacles in accordance with 406.11 of the 2016 N.E:C <br /> 24. In accordance with the Land Development Code,lots.shall be sodded'before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot water pipe insulation. <br /> Insulation for-hot water pipe with a.minimum thermal resistance (R value) of R-3 shall.be applied to the <br /> following: <br /> Piping:-h inch (19.1 mm)and larger,in nominal diameter. <br /> Piping serving more than one dwelling unit. <br /> Piping located outside the conditioned space:. <br /> Piping from the mater heater to a distribution manifold:. <br /> Piping located under,a floor slab: <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25. Blower:door test shall be provided before C.O. <br /> 26.A copy of the enemy cacls shall be with permit at all tunes <br /> 27. Copy of rhial.insulation report shall be provided with permit before rinal <br /> 28.-No fence, pool or'screen enclosure :is issued with:this.permi <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C-Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way. <br /> A.D.A.=Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />