Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 N.E:C <br /> 24. In accordance with the Land Development Code,lots shall be sodded before final at least_ 10 <br /> feet around the structure: <br /> 2& R403.5.3Hot water pipe insulation <br /> Insulation for hot.water pipe with <br /> -a minimum thermal resistance (R-value) of R-3 shall.be applied to the <br /> folbwin . <br /> Piping:/:inch (19.1.mm) and larger in.nominal diameter. <br /> Piping,serving more than one dwelling unit: <br /> Piping located outside'the conditioned space. <br /> Piping from the water heater to a distribution manifold:. <br /> Piping.located under.a floor slab. <br /> Buried in piping, <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25. Blower'door'test shall be&(Mded'before C.O. <br /> 26.A cony of the energy'cacls shall be�with permit at all times <br /> 27.. Copy of final.insulatioW ieport shall be provided with permit before linaL . <br /> 28. No fence, pool or'screen enclosure :is issued with.thisnermii~ <br /> F.F.E.-Finished Floor Elevation <br /> R13.C- Florida Building Code 6t'Edition <br /> R.O.W.-Right of Way <br /> A.D.A.7 Americans with Disabilities Act. N.E.C.-National Electric.Code(2016) <br />