My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
21-1311
Zephyrhills
>
Building Department
>
Permits
>
2021
>
21-1311
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2022 1:13:13 PM
Creation date
5/6/2022 1:13:12 PM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
21-1311
Building Department - Name
WEINGART,GARI & SANDRA TRUSTEE
Address
7908 KAY MARIE AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NUMBER OF LOCK DOWN ANCHOR ASSEMBUES NEEDED: <br /> Wind Zones 2&3 with roof pitch 6/12 or less. <br /> • Single or Double section homes 30'to 52 In length(excluding hitch) 4 <br /> • Single or Double section homes greater than ST to 76'in length(excluding hitch) 6 <br /> NOTE: Roof pitches greater than 6/12 will require additional systems,contact borne Pride,inc.for assistance. <br /> NOTE: Homes less than 30'—Lock Down System should not be used. <br /> NOTE: Home manufacturers may provide a placement chart for specific models in their installation manual.The manufacturer's placement chart supersedes the <br /> chart below. <br /> ANCHOR ASSEMBLY PLACEMENT <br /> Using 4 Anchor Assemblies Using 6 Anchor Assemblies — <br /> fzi <br /> L <br /> _ - - _ - - - - - - _ t - - - _ _ _ _ _ _ _ _ <br /> Lock Down Anchor Assembly Components Ust <br /> 1. Ground Anchor with Strut Attachment Cap <br /> 2. Stabilizer <br /> 3. Lateral nt <br /> 4. Longitudinal <br /> S. Beam Clamp Assembly <br /> •s <br /> ws <br /> � -03 <br /> i <br /> R <br /> Lock Down Anchor Assemblv_Zbstallatlon Instructions <br /> The Ground Anchor with Strut Attachment Cap will take the place of one perimeter anchor <br /> an dal Ign with a sidewall vertical strap.Install this anchor at a slight angle,not to exceed <br /> 15 degrees. This assembly includes a stabilizer plate that Is installed with the anchor and <br /> attached with a U-bolt and two nuts.The stabilizer plate should be driven into the ground <br /> when the anchor is about 2/3 installed.Attach the stabilizer to the anchor shaft using the <br /> U-bolt and nuts then complete the install of the anchor until the strut attachment cap Is _ <br /> flush to the ground or slightly recessed Into the ground,no more than W'. The Strut <br /> Attachment Cap should be Installed within 3S"or flush to the top of the stabilizer plate. <br /> (See illustration to the right.) <br /> NOTE:State of Florida allows a 2'pilot holes to be drilled to assist anchor Installation in extremely hard soil conditions. if this process is used during installation <br /> of the Ground Anchor with Strut Attachment Cap the soil must be placed flack In the pilot hole and compacted at 6"intervals.This process should take place <br /> when the anchor is 8"-10"from fully Installed—allowing room for the soil to be placed back in the pilot hole and properly packed. <br /> HONi.Ef'PIDE 2, <br />
The URL can be used to link to this page
Your browser does not support the video tag.