Laserfiche WebLink
ASS Foundation, Pad Installation -Instructions <br /> 1. Pier spacing must be in accordance with the <br /> Manufacturers Installation Manual and/or <br /> State or local requirements. <br /> 2. Clear all vegetation and debris from'area <br /> where pads are to be placed. <br /> 3. The ground under the pads must`be leveled <br /> and evenly compacted or undisturbed soil. <br /> 4. Determine pad size by testing for the soil <br /> bearing capacity,if soil testing,not available, <br /> use the 1000 PSF soil column of <br /> _the Instructions. <br /> 5. Place ABS pad with grid side up,smooth side <br /> down.-.Center blocks or pier on pad and <br /> complete Installation. <br /> -General Notes: I <br /> 1. Any configuration from the chart may-be usedi <br /> to replace a concrete or wood base pad per <br /> 3282.312(A)(3)• Good <br /> 2. The maximum load at any intermediate soil <br /> value may be interpolated between the next ;--- - - -- - <br /> lower and next higher soil values given in the <br /> pad bearing capacity chart. <br /> 3. Pad sizes are shown in nominal dimensions <br /> and may vary slightly. ! <br /> 4. Maximum deflection 3/8",measured from the gad <br /> highest point to the lowest point•of the top - - <br /> side of pad. <br /> 5. In areas susceptible to frost'heave;the pad <br /> must be at the frost line.or otherwise - - . <br /> protected from the,effects of frost.Refer to :- <br /> NCSBCS/ANSI A225.1`"Manufactured Home =--=--- --- = 318" <br /> Installations"Homes set to Standard <br /> 24 CFR 3285 should not be susceptible to <br /> frost heave. <br /> : . r . a3,2 <br /> TIErs a � araa t. . 33 <br /> 4 0401 ! t o <br />