My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
21-1312
Zephyrhills
>
Building Department
>
Permits
>
2021
>
21-1312
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2022 1:38:10 PM
Creation date
5/6/2022 1:17:12 PM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
21-1312
Building Department - Name
WEINGART,GARI & SANDRA TRUSTEE
Address
7908 KAY MARIE AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Anchor:IT-W Tapcon or Tapcon LDTor Simpson Strong-Tie. <br /> ITW Ramsetj Redhead Tapcon,114"Diameter <br /> diameter,minimum 3.5"'tong with washer that conforms to ANSI 818.221 <br /> ITW_RamseyRedhead Large Diameter Tapcon,'3j8"diameter, keep each atea clear of <br /> Simpson Titen HD,,3/8"diameter,minimum 4"long with washer that conforms. ANSLBsher t i tyoefo B. <br /> any back jamb <br /> minimum 4"long with washer that conforms 2.1 type B 18 221 type g <br /> Simpson Wedge-All,3/8"diameter,minimum 4"long with washer that conforms to ANSI 18.22.l attachment fasieneta. <br /> When applying back jambs over dry wall or other non structural wall coverin , <br /> This chart applies to wood s ecies with s ecific $ / <br /> P P gravit t .use longer fasteners to insure minimum embed" 3» <br /> See chart for minimum washer diameter. Washer diameters in chart are based on use of Spruce Pine Fir. Washers and southern be ent required. 8" dy <br /> gravity greater than or.equat to 0.42 including spruce pine fir(SP See chart for minimum edge distance required. Lowest anchor to be greater titan the minimum edge distance Washers <br /> from the floor pin alley . 1. header <br /> Y 0/smaller when Southern pine is used. <br /> and less than 10-inches from the floor... 81 <br /> FASTENER SPACING(inches). <br /> 2500.psi concrete Filled CMU <br /> Simpson <br /> ITW Tapcon strong-Tie DOOR WIDTH(feet and inches}at a,given DESIGN PRESSURE 2 4" 2 4" 3 8" 24 24g" 3 g" 14psf 17psf 20psf 24psf.28 sf 32psf 36psf 40psf 44psf 48 sf S3 sf 5$ sf 6 <br /> 24 4 Za. RE(PSF) <br /> 24 22 24 •22'-9 18-9 15'-11 13-3 11'-4 9'-11 8'- <br /> 24 24 24 24. 24'-3 20'-0 17'-0 14'_ 30 7'-11 7'-3 6'-7 6,_ ,- 3Psf 69psf 75psf. 81psf 87psf 93psf.- <br /> 24 20 24 24 24. 9�-5. 0 <br /> 24 17 ..24 <br /> 6 15'-1013- ,- . <br /> 24 15 24 16 34'-3 2$'-2 .24'-0 "1T-1 iS'0 13,.4 11 1 10'-2 9'-3 .8t q 5 5'-10 5'4 4'-11 4'-7 4'-4 <br /> 24 25 24 27 16 16 36'-3 Z9'-10 25' 4 12'-0 10'-10 10'-0 g'- T-8 T-0 6'-S' 5-11 S14 , <br /> 24 26 16 8 nja 32'-3 2T-5 10 14'-1 12'-8 li'-6 10'-7 9'- 6'-11 6 4 S'-li' S'-6 5'-1 <br /> 22 13 24 25 26 g 22'-30 19-7 17'-2 15'-2 7 8'-9 8`'0 7'-4 <br /> 29 12 trio 33-20 28'-9 13'-8 12'-5 .11'-5 10'4 9'-5'. $'-$ 7!-21 6`-3 5'-10 5'-5 Highest anchor installed at <br /> 24 14 16 g 24'-0 20'-6' IS'-0 16'-0 14'-4 13'-1 12'-0 10'-10 9'-21 i6 10 n/a n/a 31'4 26'_i ,- g,-1 8, 6'-3 5'-10 least as high as door opening. <br /> 24 12 16 g 22'-5 19 7 1T-5 15'-8 14'-3 13'-0 li'- a i6 10 24 21 n/a n/a 36-0 30'-0 25'-8 22'- 10 10 9 9'-11 9'=1. • 6'-2 <br /> 14 8 8 n/a nia. n a 6 20'0 1$'-0 16'-0 15'-0 t Anchors to be event spaced between <br /> 7 12"4 11'-5 10'-5 9'-7 '8'-10 the header and the floor, <br /> 10 14'-4 13'-1 12'-1 11'-0 g*.4 8_3 7'-8 <br /> 12 7 ZO 9 8 8 nia n a n!a 3S'-9 30'-8 26-10 23'-20 21'-5 29'-6 1T-10 16'-2 14'-9 .23'-7' .12'-5 20- l <br /> 12 7 I J nia nja 30'-21 27'-5 24'-8 ZZ'-5 20'-7 18'-8 27'-0 15' 10-2 1 $,2 <br /> 20 8 g $ 7 9 SO .9-2 <br /> 16 10 6 17 7 nja nia n/a 31'-20 28'.3 2S'-6 23'_ . <br /> 9 rtJa 16 6 ! / 2 '21'-3 19'-2 17'-7:"i6'- 12 4 10-7 0 <br /> $ n/a nia n a <br /> $ n/a n/a n/a n!a n a n a nja 32'0 28'-9 26'-2 Z4'-0 '12'-7- 11'-8 20'-11 2z6 structural grade lumber. <br /> 8 n/a 13 6 / n/a n a•, n a . 21'-8 19''-0 18'-3 i6'_g 15'-4 14-- May.be counterbored up to 3j8"deep <br /> n/a nJa 12 nja nja n/a n/a n/a n/a. n a nia nja 32'-0..29'-T 26-8. .24'-1...2Z'-0 20'-3 2 13'-2 12'-4 <br /> nia n/a .nja n/a <br /> nia n/a n a n a nia nja nja 'nja 30'-11 28'-0 25'-7 1$'6 1T0 15'-9 14'-8 23'-9 at each anchor location to Provide a <br /> 2500 psi concrete p P P npa nia nia nia n a 23=6 21'-6' 19-9 18"3 flush mounting surface. <br /> Filled CMU 14 sf '17psf. 20psf 2d sf 28 sf 32 sf 36pst 40psf 44 I 32'-4 29'-7 27-3 17'-0 15'-11 - <br /> 24-20 22 10 21'-2 19'-8 18'-5 0 <br /> Psf 48psf S3psf S8psf 63psf 69psf 7Spsf 81psf 87psf 93psf <br /> 1/4 Tapcon ITW LDT HteDn wA'ge.DOOR WIDTH(feet and inches)'at a given DESIGN PRESSURE P m <br /> 1l4" 1!4" 3/8" 3J8" 3 8" ( ) First anchor to start at no more than <br /> 1:75" 1.75" 2.5" 2.5" I 3l8" FASTENER DIAMETER SF half the fastener spacing distance and <br /> 1-1 $„ 7 2.75" 2.68" EMBEDMENTLENGTFI <br /> J !8" 1-1/2" 1" 1=1/8'1 i no less than the minimum edge distance. <br /> 2-1/2'2-ij2" 3" n I8"WASHER DIAMETER <br /> 508# 319# 859# 371# 4$Q# 34„ EDGE DISTANCE <br /> 0# FASTENER LOAD CAPACITY s <br /> r Supporting stmcturaI elements shalt be designed by registered <br /> Professional engineer for wind loads in addition to other loads. <br /> ```� This drawing does not address the jambhvall design,but only door <br /> attachment.Jamb/wall construction is shown only for illustradon <br /> Digitally signed by John E..Scates P.E. \� <br /> Manufacturer s installation instructions must be followed. Dafie:2018.02.0715:1 i.58_ �' C ��'c6Mty��"�� /Z purposes. The building assigner is responsible for'�. �" �� jamb1wa11 is sufficient to ca aP ensuring ih his <br /> Maximum spacing shown in chart 06`00' � drawing does not ad e spring ffie door live and static toads. This <br /> Lesser spacing may be used to avoid interference with door hardware Nm-51737 rma dieroved Pad corn Live as.Registered <br /> e r; professional engineer may approved an alternative design, <br /> and or fastening system,but not less than 6". Sohn E.Scates,P.E. * �*.� <br /> Load Per3amb=0.5 x door width�x'max positive pressure x door height. 2560 King Arthur,Ste 124-54 * [�[�� SCALE <br /> 8"CMU block walls shall complywith A Lewisville,TX 75056 STATE OF none <br /> STM C90. Florida P.B.#51737 �O�13 MMM DATE Use Minimum 2000 psi grout or concrete when filling CMU, e • ` ❑ <br /> TXPE56308,F-2203 �IO'�,�'�ORiOP:'''�'��.� 2-18-2015 <br /> CM fastener spacing distance may vary+J_1 , /�0/0(tjAl. \X Back Jib" <br /> Ntt Cti� Attachment Detail"Professional Engineer`s seal provided only foL etit3cation of windload construction details. Concrete Anchors <br /> C.H.I.Drawing: BJA-10.1 R'ev.-07• <br />
The URL can be used to link to this page
Your browser does not support the video tag.