Laserfiche WebLink
r <br /> 23. Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 N.E.0 <br /> 24. In accordance with the Land Development Code, lots shall be sodded before final at least 10 <br /> feet around the structure. <br /> 25. R403.5.3Hot water'pipe insulation <br /> Insulation for hot.water pipe With'a minimum thermal resistance .(R-value) of R-3 shall be applied to the <br /> following:_ <br /> Piping V/ inch (1.9.1 mm)and larger in nominal diameter., <br /> Piping serving more than:one dwelling unit. <br /> Piping located outside the conditioned space:. <br /> PipingIrom the water heater to.a distribution manifold: <br /> Piping located under.a floor slab: <br /> Buried in piping. <br /> Supply and return piping iri recirculation systems other than demand recirculation systems. <br /> 25.Blower.door test shall be provided before C.O: <br /> 26.A copy of the energy.cacls'shall be with permit at all times <br /> 27. Copy of final insulation reportshall be provided ivith permit before flnab <br /> 28. No fence,pool or screen enclosure :is issued iwith ahis pernift. <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6`..h Edition <br /> R.O.W:-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />