Laserfiche WebLink
NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed"restrictions" <br /> which may be more restrictive than County regulations. The undersigned assume-'re"spohsibility for compliance with any <br /> applicable deed restrictions. <br /> UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has-hired a contractor or <br /> contractors to undertake..work, they may be required to be licensed in accordance with state and local regulations. A the <br /> contractor is not licensed as required by law, both the owner and contractor may'be cited for a misdemeanor violation <br /> under state law. If the owner or.intended-contractor are uncertain as to what,licensing--requirements may apply for the <br /> intended work, they are advised to contact the Pasco County Building Inspection Division--Licensing Section at 727-847- <br /> 8009. Furthermore, if the owner has hired a 4contract6r or contractors, he is-advised to have the=contractor(.$) sign <br /> portions of the "contractor Block" of this application.for which.they will be responsible. If you, as the owner sign as the <br /> contractor, that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco " <br /> County. <br /> TRANSPORTATION IMPACT/UTILITIES IMPACT AND,RESOURCE.RECOVERY FEES: The undersigned understands <br /> that Transportation-Impact Fees and Recourse Recovery-Fees,may-apply to,the"construction of new buildings, change of <br /> use in existing buildings; or expansion of existing buildings,.as specified in Pasco County Ordinance number 89-07 and <br /> 90-07, as amended. The undersigned-also understands, that sucWfees, as may-be due; will be identified at the time of <br /> permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to <br /> receiving a "certificate°.of occupancy" or final power release. Ifthe-project does not1hvolve a certificate of occupancy or <br /> final power.release,.the.fees, must be paid prior to permit issuance. Furthermore, if Pasco County'Water/Sewer Impact <br /> fees are..due,.they..m,usti.be paid.priorto permit issuance in-accordance.-With applicable Pasco County ordinances. <br /> CONSTRUCTION',LIEN°LAW(Chapter 713,;Florida Statutes,as-amended): If valuation.of work'is$2,51)0:00 or"more,:l <br /> certify.- that I;" they applicant, have .been provided with- a copy of.the,"Florida Construction Lien Law—Homeowner's <br /> Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. If the:applicant:is someone <br /> other than the"own'ec'';"I`.certify that I have obtained a copy of the above- <br /> described document and promise in good faith to <br /> deliver it to the"owner"prior to commencement. <br /> CONTRALTO.....R'S/OYNNER'S;;AFFIDAVIT I.certify that;'all.>the:information:in;this:.application.is accurate;,and that all,work <br /> will be done in compliance with all applicable laws regulating construction, zoning and1and development.' Application"is <br /> hereby made to obtain a permit to do work and installation as' indicated: I certify that no work.or installation has <br /> commenced prior-tmtissuance of a permit and that.all work will-be performed to..meet`standards of all laws regulating <br /> construction °County.and City codes, zoning regulations,-and.I6h&'edevelopment regulations in the jurisdiction. I also <br /> certify.that 1.understand'that•the regulations of other government agencies may.apply-to the intended work, and that it is <br /> my responsibilityto:identify what actions I must take to be in compliance. Such agencies include but.are not limited to: <br /> Department of Environmental Protection-Cypress Bayheads, Wetland.Areas,.and.Environmentally Sensitive <br /> Lands;Water/Wastewater Treatment. <br /> Southwest Florida Water Management I District Wells, Cypress• Bayheads, Wetland Areas, Altering <br /> Watercourses. <br /> Army Corps of Engineers-Seawalls, Docks, Navigable-.lNaterways <br /> Department of Health & Rehabilitative Services/.Environmental ;Health Unit-Wells, Wastewater Treatment, <br /> Septic Tanks. <br /> US'Envi onmental Protection.Agency-Asbestos-abatement:, <br /> Federal Aviation Authority-Runways.. <br /> 1-.understand.that the-4ollowing restrictions apply to the use <br /> Use of:fill-1s not allowed in Flood,Zone'V' unlessaOxOiressly permitted., . <br /> If.the fill material'is to be used in Flood, Zone "A";"it''is-`:un'derstood-.that a drainage plan addressing a <br /> "compensating volume will be submitted at time of.permittingl which]s.prepared by a professional engineer" <br /> licensed'by:the State of Florida. <br /> If:the fill material is to:be used'in-Flood.Zone "'klhK=connection with a permitted building using stem-,,.wall- <br /> construction,.. <br /> 1 certifythat fill will be,used only to fill;the'�` the_;stem:wall. <br /> If fill. material" is to b6 used in any area, I certify that use of such fill will not adversely affect adjacent <br /> properties,.-.:If use of fill is found to adversely affect.adjacent:properties;:the-owner may;be cited for violating <br /> the conditions of the building permit Jssued under,the,attached:permit application, for lots less than one (1). <br /> ...., ,,,,c r., <br /> acre"whicKLare;;elevated by.fill, an.engineered drainage;plan is required. <br /> If I am the AGENT'P0122 HE OWNER, I promise in good"faith to:info�m:.th"wner,ofthe permitting�conditions set forth in <br /> this affidavit.,-priorto,commencing construction. .I understand'that aiseparate permit may be required for electrical work,, <br /> plumbing,,signs, wells;:.pools, air conditioning, gas; or-other installations-nof`specifically included in the,application. A <br /> permit issued.shall:be construed to be a license to proceed•with.the,work-and not as authority to violate, cancel; alter,;or. <br /> set aside.,any..provisions.of the technical codes,.nor shall''issuance:;of a permit prevent the Building Official from thereafter;: <br /> requiring:a correction of errors in plans, construction or violations,of any-codes:,•Every"permit"issued shall become invalid <br /> unless the•work.authorized by..such permit is commenced within.six_months.Of permit issuance, or if work authorized•bys., <br /> the.pertnit--is-suspended or abandoned for a period of six:(6)months after theiime the work,is commenced: An extension <br /> may be-requested,.in writing, from the Building Official for a;period<.:not to exceed ninety (90) days and will demonstrate ?• <br /> justifiable cause for-the extension. If work.ceases"..forninety(90)consecutive days,.the job.is considered abandoned. <br /> WARNING-TO OWNER: YOUR FAILURE-'TO RECORD A.NOTICE-OF-.COMMENCEMENT MAY RESULT IN YOUR' <br /> PAYING''TWICE`FOR.IMPROVEIVIENTS--TO:YOUR'-PROPERTY:`"IF'YOU INTEND TO°OBTAIN FINANCING;CONSULT' <br /> WITH YOUR'LENDER OR AN AT"I'ORNEY'.BEFORE,°REGORDING'YOUR"' TILE OF COMMENCEMENT.` <br /> FLORIDA"JURAT(F.S.1" <br /> OWNER OR AGENT CONTRACTOR <br /> Subscribed and swom to(or a ed)before me this Subscribed and swom to(j ffirmed)before me this <br /> I-20-Zt by I-Za-ZI by <br /> Who is/are personally known a or Who is/are personally kn wn tolme or has aue_pr:odused, <br /> as ntification. asidentification. <br /> Notary Public IVotaryPublic <br /> Commission No. Commission No. <br /> Name Name.of Notary tviDed,printed or stamped <br /> YEE <br /> tate of Florida <br /> -Cannon ti►*r"kNotary Public State of Florida <br /> n GG 218378 ;p Alicia 1-lerweh-Cannon <br /> 022 y< < My Commission GG 218878 <br /> �ka�df Expires 05/16/2022 <br />