My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
21-1413
Zephyrhills
>
Building Department
>
Permits
>
2021
>
21-1413
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2022 2:03:38 PM
Creation date
5/9/2022 7:20:07 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
21-1413
Building Department - Name
MUNOZ,ROSAIDY & SERRANO
Address
7808 BROAD POINTE DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.ROCK-IT SY STeITI 4.O inSTaLL <br /> r' <br /> jd. <br /> .AQ <br /> Fig. A <br /> 1. Install EcoFasten Solar Flashing,with Rock-It o'unts <br /> •Follow EcoFasten Solar Install Instructions for flashing and bracket install(GreenFasten shown above).. <br /> •Optimum vertical distance between'lag bolts Is 13/8'plus,module dimension. <br /> •Set mounts on eave most row so that the Rock-It Pedestal[son the South end of Rock-It Slide. <br /> • Set mounts on all upper rows so that the Rock-it Pedestal is on the North end of Rock-It-Slide.. <br /> 2 Install Rock-It-Array Skirt onto Eave.Mounts <br /> Slide Rock-lt Array Skirt into front channel on Rock-It Shelf. <br /> Array Skirt End Caps are pre-instal led.on the East end of each skirt section,and are used to couple the skirt sections where needed(see Fig.A). <br /> • Tighten Mid-Clamp bolt,"clamping Rock-It Array Skirt to mount:Torque to 2001n4bs.(1301n-lbs.when Installing with 32mm modules). <br /> 3-4 Install Rock-It Couplings(when joining 4 panels with a Coupling,the use of a load bearing.foot is-required)- <br /> • Prior to mounting on the roof,snap Load Bearing Foot'into the bottom of Rock-it Coupling'if required. <br /> (Each Load Bearing Foot is set to same height as the Rock-It Mounts-adjust accordingly) <br /> • Oneave row only,slide Rock-It Array Skirt onto Rock-It Coupling Shelf.Torque to specified value. <br /> NOTE:If a coupling,lands on.a rafter,the Hybrid Mount*should be used in piace.of the Rock-It Coupling"(refer to Image 3a).. <br /> 'Hybrid Mount can be made in the field by assembling a coupling to a mount pedestal,or by purchasing separately. <br /> C, Align and Straighten First Row-of the Rock-It System with Rock--It-Array Skirt <br /> • Use North-South adjustment of-the Rock-It Pedestal to straighten Rock-It Array Skirt and align module with Array Skirt. <br /> •Torque screw on side of.Rock-It Pedestal to 150 in-Ibs.to secure It to the Rock-It Slide. <br /> •"Adjust Flange Level Nut to level the system(optional-can be leveled during or after installation): <br /> Install.1st Row-of PV Modules <br /> 6-9 . Slide upslope Rock-ICMounts down to engage top offirst module. <br /> • Install Rock-It Couplings on the upslope side of 1 st row of panels.. <br /> •Torque 2nd row of Mid-Clamps on Rock-It Mounts and Rock-It Couplings to specified value. <br /> • Install balance of PV modules,ensuring that the Rock-It Pedestals are in the appropriate.position,then torque Mld-Clamps to secure modules. <br /> 10 Level the Rock-It System <br /> • When assembly is complete,level the entire system by.adjusting Flange.Level Nuts(Flange Level-Nuts have no torque value). <br /> • Height between roof surface and underside of modules should be 3'or less,when Installed With Type 2 modules. <br /> INSTALLATION NOTE:Modules should be-installed so that the junction box is installed upslope;away from the leading-edge of the array. <br /> www.ecofastensolarcom info@ecofastensolar.com 877-859-3947 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.