My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
21-1413
Zephyrhills
>
Building Department
>
Permits
>
2021
>
21-1413
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2022 2:03:38 PM
Creation date
5/9/2022 7:20:07 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
21-1413
Building Department - Name
MUNOZ,ROSAIDY & SERRANO
Address
7808 BROAD POINTE DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> � 1 <br /> Remove RJ-1,flip it over,wipe it clean&apply Reinstall Unit. Use the two supplied Decking <br /> a bead of roofing sealant to the underside of the Screws to mount the flashing to the roof. <br /> flashing unit. Ensure that it's placed in the Torque to the specification indicated in the <br /> "Upside-down U"Shape to support engress specifications. Refer to Table T2(page 10)for <br /> water protection, AS SHOWN. the proper tightening torques. <br /> STEP 10 STEP 11 <br /> POPULATE RJ-1 <br /> �k, I7 <br /> • Populate the RJ-1 unit using the <br /> appropriate wire connectors, terminal <br /> blocks, or other necessary components. <br /> • Ensure that the components installed are <br /> rated for and are suitable for the intended <br /> purpose. <br /> • The RJ-1 unit is provided with multiple }� a <br /> standoffs which can accommodate <br /> accessories to be mounted. <br /> Step 11 . A <br /> Install the cover onto the top of the enclosure. <br /> Tighten 4 cover screws to the Torque value <br /> indicated in <br /> Table T3(see page 10) <br /> STEP 12 <br /> www.soltection.com Soltection RJ-1 Installation-Manual Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.