Laserfiche WebLink
23, Tamper- Resistant.Receptacles in accordance with 406.1.1 of the.2016 N.E:C <br /> 24. In accordance with the Land Development Code,lots shall.be sodded before final at least 10 <br /> feet around the structure. <br /> 25: R403.5.3Hot.w8ter.pipe insulation <br /> Insulation for hot water-pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following': <br /> Piping-3I,inch (19.1 mm)and larger in nominal diameter. <br /> Piping,serving more than_one dwelling unit. <br /> Piping located outside'the conditioned space:. <br /> Piping from the.water heater to a distribution manifold.. <br /> Piping:located under a floor slab.. <br /> Buried in piping, <br /> 'Supply and return piping in recirculation systems other than demand recirculation-systems. <br /> 25. Blower.door test shall-be provided before C.O: <br /> 26.A cony of the energy cacl' shall be=with permit at all times <br /> 27 Cony offinal insulation report shall be provided with Permit before fnab <br /> 28. No fence,pool or screen enclosure -is issued with this permit <br /> F.F.E.-Finished Floor Elevation <br /> F:B.C- Florida Building Code Oh Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />