Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 406.11 of the.2016 N.E.0 <br /> 24. In accordance with the Land Development Code,lots shall be-sodded before final at least.10 <br /> feet around the structure. <br /> 25: R403.5.3Hot water pipe insulation <br /> insulation for hot water'pipe with a minimum thermal resistance (R-value) of R-3 shall be applied to the <br /> following: <br /> Piping 31, inch (19.1 mm)and larger in..nominal diameter., <br /> Piping.serving more than one dwelling unit. <br /> Piping located outside the conditioned space. <br /> Piping from the water heater to:a distribution manifold:. <br /> Piping:lobated under a floor slab. <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems._ <br /> 25. Blower door test shall be provided before C,O: <br /> 26.A copy o.f the ene.r-au each shall be-with Perm:it at all times. <br /> 27. Copy of-fnalinsulatioiz report-shatl-be provided ivith permit before r1naL <br /> 28. No fence, pool onscreen'enclosure' is issued with.thispermit <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C- Florida Building Code 6ffi Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />