Laserfiche WebLink
23. Tamper- Resistant.Receptacles in accordance with 406.11 of the 2016 lV:E:C <br /> 24. In accordance with the Land Development Code, lots.shall be sodded before final at least,10 <br /> feet around the structure. <br /> 25. R403.5.3Hot water,pipe insulation. <br /> Insulation for.hot water pipe'with a minimum thermal resistance (R-value) of R-3.shall tie applied to the:- . <br /> following: <br /> Piping4. inch (19.1 mm)and larger in nominal diameter. <br /> Piping,serving more than:one dwelling unit. <br /> Piping located outside the conditioned space.- <br /> Piping from the water heaterto.a distribution manifold:, <br /> Piping located under'a floor slab. <br /> Buried in piping. <br /> Supply and_return piping in recirculation systems other than demand recirculation systems._ <br /> 25.Blower:door test shall be provided.before C.O. <br /> 26.A cony of the energy-cacls shall be with permit at all times <br /> 27. Cony offfnal'insulation-report shall be provided with Permit before final <br /> .28.1 No fence, pool onscreen enclosure :is issued with:this permit <br /> F.F.E.-Finished Floor Elevation <br /> RB.C- Florida Building Code 6a'Edition <br /> R.O.W.-Right of Way <br /> A.D.A. Americans with Disabilities Act N.E.C.-National Electric Code (2016) <br />