Laserfiche WebLink
23. Tamper-Resistant.Receptacles in accordance with 406.11 of the 2016 ME <br /> 24. In accordance with the Land Development Code,lots shall b sodded before-final at least.10 <br /> feet around'the structure: <br /> 25: R403.5.3Hot water pipe insulation <br /> Insulation for.hot.water pipe with a minimum thermal resistance (R-value) of R-3 shall bd applied to the <br /> following:: <br /> Piping 51. inch (1,9.1 mm)and larger in.nominal diameter; <br /> Piping serving more than:one dwelling unit: <br /> Piping located outsidethe conditioned space.. <br /> Piping'from the'water'heater to a distribution manifold:, <br /> Piping:located under a floor slab: <br /> Buried in piping. <br /> Supply and return piping in recirculation systems other than demand recirculation systems. <br /> 25: Blower.door test shall be provided Before C.Q; <br /> 26.A copy of the enerry cacls shall be with permit at all tunes <br /> 27. Copy of flinal insulationf report shalllie Provided with permit before fnax <br /> 28. No fence,pool or'screen enclosure'.is issued ivith:this permit. <br /> RRE.-Finished_ Floor Elevation <br /> F:B.G.Florida Building Code Oh Edition <br /> R.O.W:-Right-of Way <br /> A.D.A.-Americans with Disabilities Act N.E.C.-National Electric Code(2016} <br />