Laserfiche WebLink
23. Tamper- Resistant Receptacles in accordance with 406.11 of the 2016 N.E:C <br /> 24. In accordance with the Land Development Code, lots shall be-sodded before final at least.10 <br /> . <br /> feet around the structure. <br /> 25. R403.5.3Hot water pipe insulation <br /> Insulation for hot water pipe with a minimum thermal resistance (R-value) of R-3.shall be applied to the <br /> followin . . <br /> Piping-1. inch (1.9.1 mm) and larger in nominal diameter.. <br /> Piping,serving more than.one dwelling unit: <br /> Piping located outside the conditioned space... <br /> Piping from the.water heater to a-distribution manifold: <br /> Piping located under.a floor slab: <br /> .Buried in piping, <br /> Supply and return-piping in.recirculation. systems other than demand recirculation systems. <br /> 25.Blower door test shall be provided before C.O. <br /> 26.A copy of the energy cacls shall be with permit at all Times <br /> -27. Copy of finalinsulationreport shall be provided with permit before finaL <br /> 28,No_fence,-pool or screen enclosure :is issued with ahis.permit. . <br /> F.F.E.-Finished Floor Elevation <br /> F.B.C--Florida Building Code 6 h Edition <br /> R.O.W.-Right of Way <br /> A.D.A.-Americans with Disabilities Act, N.E.C.-National Electric Code(2016) <br />