My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
21-1546
Zephyrhills
>
Building Department
>
Permits
>
2021
>
21-1546
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2022 2:37:05 PM
Creation date
5/9/2022 10:37:39 AM
Metadata
Fields
Template:
Building Department
Company Name
KAR KRAFT SERVICES LLC
Building Department - Doc Type
Permit
Permit #
21-1546
Building Department - Name
KAR KRAFT SERVICES LLC
Address
5727 6TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SC7f,A(TER Construction <br /> 8949 Gall Boulevard, Zephyrhills, FI 33541 <br /> PH: (813) 782-0920 & (352) 567-8580 Fax: (813) 715-4875 <br /> STATE CERTIFIED BUILDING AND ROOFING CONTRACTOR#CB-0059817 and #CC-0058134 <br /> Serving Florida's Finest Homes & Businesses since 1976 <br /> 02/15/21 <br /> Erik Todt <br /> Kar Kraft <br /> 5727 6th Street <br /> Zephyrhills,FL 33542 <br /> We hereby propose to supply materials, labor, and permits as necessary to: <br /> GENERAL JOB DISCRIPTION <br /> SCOPE OF WORK: <br /> • Demo 211x20' existing concrete pad <br /> s Install 20'x45' concrete area w/footers to support 24' Vertical A=Frame Enclosure <br /> Our quote includes : Clean up of our work, supervision, all workers fully covered by Workers <br /> Compensation, and general liability. <br /> Schaper Construction will warrantee our workmanship and basic building materials <br /> (manufactured products and fixtures are warranted by manufacturers) and issue any <br /> manufacturers warrantee on all fixtures effective from installation date, after full payment for <br /> all work or services. <br /> Our quote does not include: HVAC, electrical,painting,plumbing, drywall work,wall finishes, <br /> sod, sprinkler, of landscaping work. <br /> NOTE:OUR QUOTE DOES NOT INCLUDE CORRECTION OF ANY EXISTING DEFICIENCIES,REPAIRS REQUIRED DUE TO <br /> HIDDEN DAMAGE,OR UPGRADES REQUIRED BY GOVERNING AGENCIES. <br /> ANY CHANGES OR ADDITIONAL WORK REQUESTED WILL REQUIRE A WRITTEN AND SIGNED CHANGE ORDER. <br /> CHANGE ORDERS WILL BE PAID FOR IN FULL AT SIGNING. <br /> ALLOWANCES: <br /> • ADDITIONAL WORK AND COSTS ABOVE ANY STATED ALLOWANCES(if stated above)WILL BE PERFORMED AS A <br /> TIME AND MATERIAL CHANGE ORDER,ABOVE AND BEYOND THIS AGREEMENT. SCHAPER CONSTRUCTION <br /> LABOR RATE IS$38.00 PER HOUR. SUBCONTRACTOR WORK AND MATERIAL PRICES WILL REFLECT A 20% <br /> CONTRACTOR FEE. <br /> PRICE:. 24,000.00 <br /> Terms: payment terms <br /> Pau4ar r representative) <br /> Construction Manger <br /> I accept the ab ve price and t ms. <br /> Signed: Date <br /> [3part]BASIC PROPSAL 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.