My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
21-1558
Zephyrhills
>
Building Department
>
Permits
>
2021
>
21-1558
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2022 2:37:47 PM
Creation date
5/9/2022 10:46:23 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
21-1558
Building Department - Name
BELLINE MORENCY PATRICK JUD
Address
6407 COBBLE BLISS ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Astra v.1 <br /> .31 <br /> ry Februa 9,2021 sunrun WS <br /> CAT 1 <br /> Subject:Structural Certification for Proposed Residential Solar Installation. <br /> Job Number:802R-407MORE;Rev A No % <br /> Client:Belline Morency <br /> Address:6407 Cobble Bliss St,Zephyrhills, FL,33541 '9' TE of 4u <br /> Attn:To Whom It May Concern Digitally fined on:21912021 <br /> A field observation of the existing structure at the address indicated above was performed by a site survey team from Sunrun.Structural <br /> evaluation of the loading was based on the site observations and the design criteria listed below. <br /> Design Criteria: <br /> •2020 FBC(7th Ed.)Amendments to 2018 IRC/IBC/IEBC,7-10 ASCE&2018 NDS <br /> •Basic Wind Speed V=138 mph, Exposure B <br /> •Ground Snow Load=0 psf <br /> Based on this evaluation,I certify that the alteration to the existing structure by the installation of the PV system meets the requirements of the <br /> applicable existing building and/or new building code provisions referenced above. <br /> Additionally, I certify that the PV module assembly including all attachments supporting it have been reviewed to be in accordance with the <br /> manufacturer's specifications. <br /> Results Summary(Hardware Check Includes Uplift Check on Attachments/Fastener;Structure Check Considers Main Structure) <br /> Orientation" Attachment.Spacing/Cantilever Configuration: Governing Result <br /> DCR' _ <br /> AR-01 Landscape 72/28 Stacked 53% Pass'. <br /> Portrait 48/24 Stacked 81% Pass <br /> Roofing Material Pitch Structure Check: <br /> Comp Shingle 22' ; Pass <br /> Orientation Attachment Spacing/Cantilever".`'° Configuration. GoverningDCR Result <br /> AR-02 Landscape 72/28 Stacked 53% _ 'Pass <br /> Portrait 48/24 Stacked 81% Pass'' <br /> Roofing Material Pitch Structure Check. <br /> Comp Shingle 22° Pass :- <br /> 225 Bush St.Suite 1400 San Francisco,CA 94104 1 P (949)383-0993 <br />
The URL can be used to link to this page
Your browser does not support the video tag.