My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
21-1588
Zephyrhills
>
Building Department
>
Permits
>
2021
>
21-1588
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2022 11:07:10 AM
Creation date
5/9/2022 11:07:09 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
21-1588
Building Department - Name
COLON,RAFEL & OROZCO
Address
7851 KAY MARIE AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- - _ 1_r'-.,"�4,�';� "�ss�;c�.p.z,;Y" <br /> ir <br /> ' _ate—. :'za'3a:�_ , <br /> t <br /> 467 Swan Ave • Hohenwald,TN 38462 • (800) 284-7437 • www.olivertechnologies.com • Fax (931) 796-8811 <br /> OLIVER TECHNOLOGIES,INC. <br /> FLORIDA INSTALLATION INSTRUCTIONS FOR THE <br /> MODEL 1101 "V"SERIES ALL STEEL FOUNDATION SYSTEM <br /> MODEL 1101"V"(Steps 1-14) <br /> LONGITUDINAL ONLY:Follow Steps 1-9 <br /> LATERAL ONLY:Follow Steps 1-3 and Steps 10-14 <br /> ENGINEERS STAMP FOR CONCRETE APPLICATIONS:Follow Steps 15-18 ENGINEERS STAMP <br /> 1.SPECIAL CIRCUMSTANCES:If the following conditions occur-STOP!Contact Oliver Technologies at 1-800-284-7437: <br /> a)Pier height exceeds 48" c)Roof eaves exceed 16" e)Location is within 1500 feet of coast <br /> b)length of home exceeds 76' d)Sidewall height exceed 96" <br /> INSTALLATION OF GROUND PAN <br /> 2.Remove weeds and debris in an approximate two foot square to expose firm soil for each ground pan(C). <br /> 3.Place ground pan(C)directly below chassis I-beam.Press or drive pan firmly into soil until flush or below soil then install pier per <br /> manufacturer's instructions or per Florida Regs. <br /> SPECIAL NOTE:The longitudinal"V"brace system may also serve as a pier under the home and should be loaded as any other pier. <br /> It is recommended that after leveling piers,and one-third inch(1/3")before home is lowered completely on to piers,complete <br /> steps 4 through 9 below then remove jacks. <br /> INSTALLATION OF LONGITUDINAL"V BRACE SYSTEM(Model 1101 L"V") <br /> NOTE:WHEN INSTALLINGTHE LONGITUDINAL SYSTEM ONLY,A MINIMUM OF 2 SYSTEMS PER FLOOR SECTION IS REQUIRED.SOILTEST PROBE SHOULD BE <br /> USED TO DETERMINE CORRECTTYPE OF ANCHOR PER SOIL CLASSIFICATION.IF PROBETEST READINGS ARE BETWEEN 175&275 A 5 FOOT ANCHOR MUST <br /> BE USED.IF PROBETEST READINGS ARE BETWEEN 276&350 A 4 FOOT ANCHOR MAY BE USED.USE GROUND ANCHORS WITH DIAGONALTIES AND <br /> STABILIZER PLATES EVERY 5W'.VERTICALTIES ARE ALSO REQUIRED ON HOMES SUPPLIED WITH VERTICALTIE CONNECTION POINTS(PER FLORIDA REG.). <br /> 4.Choose one of the approved longitudinal tube installations;either Diagram A or B.Then select the correct square tube(E)length from the <br /> diagram for appropriate pier height at support location or cut and drill 1.5"square tube to achieve appropriate length. <br /> PIER HEIGHT 1.25" 1.50" PIER HEIGHT 1.50" <br /> (400 Min.- 456 Max.) Tube Length Tube Length 9/16"Dia.(562)hole (400 Min.- 60°Max.) Tube Length <br /> 7 3/4"to 25" 22" f <br /> _ L,. R 7•;/4., s; `32=;_:, ' '`,T8_.:�,; - 1 18 to 25. 28 <br /> 33 to41 44 18 <br /> =40 to 48 <br /> Part E "' " ' <br /> - 30 to 40- 44 <br /> Diagram A 0.75" - <br /> Diagram B <br /> 5.Install(2)of the 1.50"square tubes(E)into the"U"bracket(J),insert carriage bolt and leave nut loose for final adjustment. <br /> 6.Place I-beam connector(F)loosely on the bottom flange of the I-beam. <br /> 7.(For Diagram A installation)Slide the selected 1.25"tube(E)into a 1.50"tube(E)and attach to I-beam connectors(F)and fasten loosely <br /> with bolt and nut.(For Diagram B installation)Attach the selected 1.5"tubes(E)to the I-beam connectors(F)and fasten loosely with bolts <br /> and nuts: <br /> 8.Repeat steps 6 through 7 to create the"V"pattern of the square tubes loosely in place. <br /> 9:Using standard hand tools tighten all nuts and bolts.(For Diagram A installation only,secure 1.25"and 1 .50"tubes using <br /> four(4) 1 /4"-14 x 3/4"self-tapping screws in pre-drilled holes.) <br /> INSTALLATION OF LATERALTELESCOPING TRANSVERSE ARM SYSTEM(Model 1101 T"V") <br /> THE MODEL 1101"W(LONGITUDINAL&LATERAL PROTECTION)ELIMINATES THE NEED FOR STABILIZER PLATES&FRAME TIES. <br /> NOTE:THE USE OF THIS SYSTEM REQUIRES VERTICAL TIES SPACED AT 54". <br /> FOUR FOOT(4')GROUND ANCHOR MAY BE USED EXCEPT WHERE THE HOME MANUFACTURER SPECIFIES DIFFERENT. <br /> 10.Install remaining vertical tie=down straps and 4'ground anchors per home manufacturer's instructions.NOTE:Centerline anchors <br /> to be sized according to soil torque condition.Any manufacturer's specifications for sidewall anchor loads in excess of 4,000 lbs. <br /> require a V anchor per Florida Code. <br /> 11.Select the correct square tube brace(H)length for set-up lateral transverse at support location.The lengths come in either 60"or <br /> 72"lengths.(With the 1.50"tube as the bottom tube,and the 1.25"tube as the inserted tube.) <br /> 12. Install the 1.50 transverse brace(H)to the ground pan connector(D)with bolt and nut. <br /> 13. Slide 1.25"transverse brace into the 1.50"brace and attach to adjacent I-beam connector(1)with bolt and nut. <br /> 14.Secure 1.50"transverse arm to 1.25"transverse arm using four(4) 1 /4"-14 x 3/4"self-tapping screws in pre-drilled holes. Page I <br /> PATENT#6634150&OTHER PATENT PENDING Revision 08/23/18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.