Laserfiche WebLink
1 7 7 T- Tj <br /> STRUCTURAL ENGINEERS <br /> November 4, 2019 <br /> ALL WORK SHALL COMPLY WITH PREVAILINQ, <br /> Mr.Thomas Campbell CODES IFLORm BUILDING CODE, <br /> Florida Department of Business and Professional Regulation NATIONAL ELECTRIC CODE, <br /> 2601 Blair Stone Road AND THE CITY OF ZEPHYRHILL-S <br /> • Building C ORDINANCES <br /> Tallahassee, Florida 32399-6563 <br /> RE: Plan Approval <br /> Robin Builders, Inc. -GA <br /> Plan# ROBIN GA FBCP.2010-17 W DA'*�% <br /> REVIEW <br /> CITY OF ZEPHYRII'LL <br /> PLAN EXANUNIMM <br /> Dear Mr. Campbell, <br /> Per the requirements of the Florida Department of Business and Professional Regulations,the <br /> above referenced plans have been reviewed for compliance with: <br /> 2017 Florida Building Code, 61h Edition <br /> 2014 National Electrical Code(NFPA-70) <br /> These plans comply with Florida Product Approval Rule 61 G20-3.006 (FAC) <br /> A signed and sealed set of plans are maintained on file with Topline Engineering, LLC. <br /> All mandatory comments have been satisfied and plans are approved for construction by <br /> a currently approved modular building manufacturer. <br /> If you have any questions or require my assistance in any way, please do not hesitate to <br /> contact me. <br /> Thank you. <br /> Respectfully, <br /> William E. Neary, III <br /> Business Partner <br /> Topline Engineering, LLC <br />