ROCK-IT SYSTem 4.0 inSTaLL <br /> �•i <br /> Fig.A <br /> 1:. Install EcoFasten Solar Flashing with Rock-It-Mounts. <br /> •Follow EcoFasten Solar Install instructions forflashing and bracket install(GreenFasten shownabove). <br /> •-Optimum vertical distance between lag bolts is 13/B'plus module dimension. <br /> •Set mounts on eave most row so that the Rock-It Pedestal is on the South end of Rock-It Slide. <br /> • Set mounts on all upper rows so that the Rock-It Pedestal is on the North end of Rock-It Slide.. <br /> 2 Install Rock-It-Array Skirt onto.Eavee-Mounts <br /> • Slide Rock-lt Array Skirt into front channel on Rock-It Shelf. <br /> Array Skirt End Caps are pre-installed.on the East end of each skirt section,and are used to couple the skirt sections-where needed(see.Fig.A_). <br /> • Tighten Mid-Clamp bolt,*clamping Rock-It Array Skirt to mount:Torque_to 2001n-Ibs.(1301n-Ibs.when Installing with 32mm modules). <br /> 34 Install Rock-It Couplings(when joining panels with a Coupling,the,use of a load bearidg.foot is required)- <br /> • Prior to mounting on the roof,snap-Load Bearing Foot"into.the bottom of Rock-It Coupling If required. <br /> (Each Load Bearing Foot is set to same height as the Rock-It Mounts-adjust accordingly) <br /> • On eave'row only,slide Rock-It Array Skirt onto Rock-ItCoupling,Shelf.Torque to specified value. <br /> NOTE:If a coupling.lands on.a rafter,.the Hybrid Mount*should be used In place.of the Rock-It Coupling(refer to image3a). <br /> 'Hybrid Mount can be made in the field by assembling a coupling to a mount pedestal,or by purchasing separately. <br /> 5 Align and Straighten'First Row-of the Rock-It System with Rock=lt Array Skirt- <br /> Use North-South adjustment of the Rock-it Pedestal to straighten Rock-It Array Skirt and align module with Array Skirt . <br /> •Torque screw on side of Rock-It Pedestal to 150 In-Ibs to secure it to the Rock-It Slide. <br /> •Adjust Flange Level Nut to level the system(optional—can be leveled during or after Installation). <br /> (� <br /> Install.1St Row ofPV Modules <br /> 6-9 • Slide.upslopeRock-It-Mounts down to engage top offirstmodule. <br /> • Install Rock-It Couplings on the upslope side of I st row of panels.. <br /> •Torque 2nd row of Mid{lamps on Rock-It Mounts and Rock-It Couplings to specified value. <br /> • Install.balance of PV modules,ensuring that the Rock-It Pedestals are Inthe appropriate position,then torque Mid-Clamps to secure modules. <br /> 10 Level the Rock-it System <br /> When assembly is complete,level the entire system by.adjusting Flange Level.Nuts(Flange Level Nuts have no torque value). <br /> • Height between roof surface and underside of modules should be 3°or less,when Installed withType 2 modules. <br /> INSTALLATION NOTE:Modules should be.lnstalled so.that the.junction box Is installed upslope,away from the leading edge of the array. <br /> wwmecofastensolarcom info@ecofastensolarcom 877-859-3947- 5 <br />