NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed"restrictions"
<br /> which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any
<br /> applicable deed restrictions.
<br /> UNLICENSED CONTRACTORS AND CONTRACTOR.RESPONSIBILITIES: If the owner has hired a contractor or
<br /> contractors to undertake work,they may be required to be licensed in accordance with state and local regulations. It the
<br /> contractor is not licensed as required by law, both the owner and.contractor may be cited for a misdemeanor violation
<br /> under state law. If the owner or Intended can are uncertain as to what licensing requirements may apply for the
<br /> intended work,they are advised to contact the Pasco County Building Inspection Division--Licensing Section at 727-847-
<br /> 8009. Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign
<br /> portions of the"contractor Block"of this application for which they will be responsible. If you,as the owner sign as the
<br /> contractor,that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco
<br /> County.
<br /> TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understands
<br /> that Transportation Impact Fees and Recourse.Recovery Fees may apply to the construction of new buildings,change of
<br /> use in existing buildings,or expansion of existing buildings,as specified in Pasco County Ordinance number 89-07 and
<br /> 90-07,as amended. The undersigned also understands,that such fees,as may be due,will be identified at the time of
<br /> permitting, it is further understood that Transportation Impacl.Fees and Resource Recovery Fees must be paid prior to
<br /> receiving a`certificate of occupancy"or final power release. If the project does not involve a certificate of occupancy or
<br /> final power release, the fees must be paid prior to permit Issuance. Furthermore,if Pasco County Water/Sewer impact
<br /> fees are due,they must be paid prior to permit issuance In accordance with applicable Pasco.County ordinances.
<br /> CONSTRUCTION LIEN LAW(Chapter 713,Florida Statutes,as amended): If valuation of work Is$2,500.00 or more,I
<br /> certify that 1, the applicant, have been provided with a copy of the "Florida Construction Lien Law—Homeowner's
<br /> Protection Guide"prepared by the Florida Department of,Agriculture and Consumer Affairs. If the applicant is someone
<br /> other than the"owner".I certify that i have obtained a copy of the above described document and promise in good faith to
<br /> deliver it to the"owner'prior to commencement.
<br /> CONTRACTOR'SIOWNER'S AFFIDAVIT: I certify that all the information in this application Is accurate and that all work
<br /> will be done in compliance with all applicable laws regulating construction,zoning and land development. Application is
<br /> hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has
<br /> commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating
<br /> construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also
<br /> certify that 1 understand that the regulations of other government agencies may apply to the intended work,and that it is
<br /> my responsibility to Identify what actions i must take to be In compliance, Such agencies include but are not limited to:
<br /> Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive
<br /> Lands,Water/Wastewater Treatment.
<br /> Southwest Florida Water Management District-Welts, Cypress Bayheads, Weiland Areas, Altering
<br /> Watercourses.
<br /> Army Corps of Engineers-Seawalls,Docks,Navigable Waterways.
<br /> Department of Health & Rehabilitative Services/Environmental Health Unit-Wells. Wastewater Treatment,
<br /> Septic Tanks,
<br /> US Environmental Protection Agency-Asbestos abatement.
<br /> Federal Aviation Authority-Runways.
<br /> I understand that the following restrictions apply to the use of fill:
<br /> Use of fill is not allowed in Flood Zone"V"unless expressly permitted.
<br /> If the fill material is to be used in Flood Zone A", it is understood that a drainage plan addressing a
<br /> "compensating volume"will be submitted at time of permitting.which is prepared by a professional engineer
<br /> licensed by the State of Florida.
<br /> If the fill material is to be used in Flood Zone"A'In connection with a permitted building using stem wall
<br /> construction,I certify that fill will be used only to fill the area within the stem wall.
<br /> If fill material is to be used In any area, I Certify that use of such fill will not adversely affect adjacent
<br /> properties. If.use of fill is found to adversely affect adjacent properties,the owner may be cited for violating
<br /> the conditions of the building.permit Issued under the attached permit application,-for tots less than one(1)
<br /> acre which are elevated by fill,an engineered drainage plan is required.
<br /> If I am the AGENT FOR THE OWNER,I promise in good faith to inform the owner of the permitting conditions set forth in
<br /> this affidavit prior to commencing construction. I understand that a separate permit.may be required for electrical work,
<br /> plumbing, signs, wells, pools, air conditioning, gas, or other installations not specifically included In the application. A
<br /> permit Issued shall be construed to be a license to proceed with the work and not as authority to violate,cancel,alter,or
<br /> set aside any provisions of the technical codes,nor shalt issuance of a permit prevent the Building Official from thereafter
<br /> requiring a correction of errors in plans,construction or violations of any codes. Every permit issued shall become invalid
<br /> unless the work authorized by such permit is commenced within six months of permit issuance,or if work authorized by
<br /> the permit is suspended or abandoned for a period of six(6)months after the time the work is commenced. An extension
<br /> may be requested, in writing,from the Building Official for a period not to exceed.ninety(90)days and will demonstrate
<br /> justifiable cause for the extension. If work ceases for ninety(90)consecutive days,the job is considered abandoned.
<br /> WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR
<br /> PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. iF YOU INTEND TO OBTAIN FINANCING,CONSULT
<br /> WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT.
<br /> FLORIDA JURAT iF.S.117 03)
<br /> OWNER OR(G N �_ CONTRACTOR
<br /> IrWd ad r or i ti a be a Ihis Subscribed and sworn to for affirmed)before me this
<br /> bMno tstao p city own to meter haSRSaVe produced Who Ware personal known to me or hasthave produced
<br /> as identification. as Identification.
<br /> �� Lary Public Notary Public
<br /> Commission No Commission No.
<br /> p�_d:,,_p_�And�t1eNdp1Cr,9Si�a1tltI��pLbSOi�
<br /> ° tyNtY d6MW9btVfv.ff 6G 13.5667 Name of Notary typed,printed or stamped
<br /> :�'• 4 EXPIRES:September 17,202.1
<br /> ^r•.....'a`
<br /> F$FF°' Bonded Thru Notary Public Underwriters
<br />
|